Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size
نویسنده
چکیده
Follow this and additional works at: http://engagedscholarship.csuohio.edu/bus_facpub Part of the Business Administration, Management, and Operations Commons Publisher's Statement NOTICE: this is the author’s version of a work that was accepted for publication in European Journal of Operational Research. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in European Journal of Operational Research, 210 (2011), 10.1016/j.ejor.2010.09.031
منابع مشابه
Tardiness Risk at a Steel Mill
A customer who places a tentative order at a steel mill customarily receives a due-date quotation, namely the date by which the mill says that it will ship the order. The steel mill wants the due date to be early enough so that the customer won’t balk (withdraw the order), but late enough so that the probability of tardiness is low. This note obtains expressions for the tardiness probability at...
متن کاملAn integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production
In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...
متن کاملRole of batch size in scheduling optimization of flexible manufacturing system using genetic algorithm
Flexible manufacturing system (FMS) readily addresses the dynamic needs of the customers in terms of variety and quality. At present, there is a need to produce a wide range of quality products in limited time span. On-time delivery of customers’ orders is critical in make-to-order (MTO) manufacturing systems. The completion time of the orders depends on several factors including arrival rate, ...
متن کاملA single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time
Lead time is one of the major limits that affect planning at every stage of the supply chain system. In this paper, we study a continuous review inventory model. This paper investigates the ordering cost reductions are dependent on lead time. This study addressed two-echelon supply chain problem consisting of a single vendor and a single buyer. The main contribution of this study is that the in...
متن کاملCoordinating Order Acceptance and Batch Delivery for an Integrated Supply Chain Scheduling
This paper develops Order Acceptance for an Integrated Production-Distribution Problem in which Batch Delivery is implemented. The aim of this problem is to coordinate: (1) rejecting some of the orders (2) production scheduling of the accepted orders and (3) batch delivery to maximize Total Net Profit. A Mixed Integer Programming is proposed for the problem. In addition, a hybrid meta-heuristic...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- European Journal of Operational Research
دوره 210 شماره
صفحات -
تاریخ انتشار 2011