The strategic and tactical value of a 3D geotechnical model for mining optimization, Anglo Platinum, Sandsloot open pit

ثبت نشده
چکیده

Geology and the detailed understanding of its properties are fundamental to the optimal design and successful operation of any mine. To that end, extensive fieldwork was conducted at Sandsloot open pit (PPRust— Anglo Platinum) to collect geotechnical information both from exploration boreholes and in-pit mining faces. Over a fie-year period, geotechnical data were collected from 29, 213 m of exploration core and 6 873 m of exposed mining faces. Extensive field and laboratory testing was undertaken in order to define the complete set of geotechnical properties for each rock type in the Sandsloot mining area. The geotechnical information collected was stored in the Datamine mining software package. The architecture of the database was developed along the principles used for generating an ore reserve model. The geotechnical data, namely mining rock mass rating system (MRMR), uniaxial compressive strength (UCS), fracture frequency per metre (FF/m) and rock quality designation (RQD), was modelled using geostatistics to generate a 3D geotechnical model. Data was interpolated between exploration boreholes and exposed mining faces. The modelling was constrained, using wireframes, by rock type and major structural features. The result is a block model containing 15 m3 blocks of interpolated geotechnical information. The size of the model blocks are linked to the mining bench height of 15 m. By having detailed geotechnical information available in a 3D model, which can be readily accessed and interpreted, significant production optimizations, feasibility studies and planning initiatives can be implemented. From a slope design perspective, the model is used to target data deficient zones and highlight potentially weak rock mass areas. As this can be viewed in 3D, the open pit slopes can then be designed to The strategic and tactical value of a 3D geotechnical model for mining optimization, Anglo Platinum, Sandsloot open pit

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

Effects of geometrical and geomechanical properties on slope stability of open-pit mines using 2D and 3D finite difference methods

Slope stability analysis is one of the most important problems in mining and geotechnical engineering. Ignoring the importance of these problems can lead to significant losses. Selecting an appropriate method to analyze the slope stability requires a proper understanding of how different factors influence the outputs of the analyses. This paper evaluates the effects of considering the real geom...

متن کامل

ORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming

Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...

متن کامل

The development of a process flowsheet for the new Anglo

129 Introduction The Platreef is a geological region of the Bushveld Complex—the largest source of primary platinum group metals, PGMs, in the world. PGM mineralization in the area was first reported by Dr Hans Merensky in 1924. The operation is part of the Anglo Platinum operations Potgietersrust Platinums Limited, ‘PPL’, being a wholly owned subsidiary. The operations are situated on the Nort...

متن کامل

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006