Monitoring surgical and medical outcomes: the Bernoulli cumulative SUM chart. A novel application to assess clinical interventions.

نویسندگان

  • G Leandro
  • N Rolando
  • G Gallus
  • K Rolles
  • A K Burroughs
چکیده

BACKGROUND Monitoring clinical interventions is an increasing requirement in current clinical practice. The standard CUSUM (cumulative sum) charts are used for this purpose. However, they are difficult to use in terms of identifying the point at which outcomes begin to be outside recommended limits. OBJECTIVE To assess the Bernoulli CUSUM chart that permits not only a 100% inspection rate, but also the setting of average expected outcomes, maximum deviations from these, and false positive rates for the alarm signal to trigger. METHODS As a working example this study used 674 consecutive first liver transplant recipients. The expected one year mortality set at 24% from the European Liver Transplant Registry average. A standard CUSUM was compared with Bernoulli CUSUM: the control value mortality was therefore 24%, maximum accepted mortality 30%, and average number of observations to signal was 500-that is, likelihood of false positive alarm was 1:500. RESULTS The standard CUSUM showed an initial descending curve (nadir at patient 215) then progressively ascended indicating better performance. The Bernoulli CUSUM gave three alarm signals initially, with easily recognised breaks in the curve. There were no alarms signals after patient 143 indicating satisfactory performance within the criteria set. CONCLUSIONS The Bernoulli CUSUM is more easily interpretable graphically and is more suitable for monitoring outcomes than the standard CUSUM chart. It only requires three parameters to be set to monitor any clinical. INTERVENTION the average expected outcome, the maximum deviation from this, and the rate of false positive alarm triggers.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A risk adjusted self-starting Bernoulli CUSUM control chart with dynamic probability control limits

Usually, in monitoring schemes the nominal value of the process parameter is assumed known. However, this assumption is violated owing to costly sampling and lack of data particularly in healthcare systems. On the other hand, applying a fixed control limit for the risk-adjusted Bernoulli chart causes to a variable in-control average run length performance for patient populations with dissimilar...

متن کامل

Cumulative Sum Charts for High Yield Processes

The cumulative sum (CUSUM) chart, well-known to be sensitive in detecting small and moderate parameter changes, is proposed here for monitoring a high yield process. The sensitivities of the CUSUM charts based on geometric, Bernoulli and binomial counts are compared. Based on the comparisons, recommendations for the selection of a chart are provided. Simple procedures are given for optimal desi...

متن کامل

Risk-adjusted monitoring of binary surgical outcomes.

A graphical procedure suitable for prospectively monitoring surgical performance is proposed. The approach is based on accumulating evidence from the outcomes of all previous surgical patients in a series using a new type of cumulative sum chart. Cumulative sum procedures are designed to "signal" if sufficient evidence has accumulated that the surgical failure rate has changed substantially. In...

متن کامل

The Effect of Estimation Error on Risk-adjusted Bernoulli GEWMA Control Chart in Multistage Healthcare Processes

Background and objectives: Risk-adjusted Bernoulli control chart is one of the main tools for monitoring multistage healthcare processes to achieve higher performance and effectiveness in healthcare settings. Using parameter estimates can lead to significantly deteriorate chart performance. However, so far, the effect of estimation error on this chart in which healthcare ...

متن کامل

Debate: what is the best method to monitor surgical performance?

BACKGROUND There is considerable recent interest in the monitoring of individual surgeon or hospital surgical outcomes. If one aggregates data over time and assesses performance with a funnel plot, then the detection of any process deterioration or improvement could be delayed. The variable life adjusted display (VLAD) is widely used for monitoring on a case-by-case basis, but we show that use ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Postgraduate medical journal

دوره 81 960  شماره 

صفحات  -

تاریخ انتشار 2005