A Multistage Stochastic Programming Approach to Open Pit Mine Production Scheduling with Uncertain Geology

نویسندگان

  • Natashia Boland
  • Irina Dumitrescu
  • Gary Froyland
چکیده

The Open Pit Mine Production Scheduling Problem (OPMPSP) studied in recent years is usually based on a single geological estimate of material to be excavated and processed over a number of decades. However techniques have now been developed to generate multiple stochastic geological estimates that more accurately describe the uncertain geology. While some attempts have been made to use such multiple estimates in mine production scheduling, none of these allow mining and processing decisions to flexibly adapt over time, in response to observation of the geological properties of the material mined. In this paper, we use multiple geological estimates in a mixed integer multistage stochastic programming approach, in which decisions made in later time periods can depend on observations of the geological properties of the material mined in earlier periods. Since the material mined in earlier periods is determined by our decisions, the information received about uncertain properties, and when that information is available, is decision-dependent. Thus we tackle the difficult case of stochastic programming with endogeneous uncertainty. We extend a successful mixed integer programming formulation of the OPMPSP to this stochastic case, and show that non-anticipativity can be modelled with linear constraints involving variables already present in the model. We extend this observation to the general class of endogenous stochastic programs, and exploit the special structure of our model to show that in some cases we can omit a significant proportion of these constraints. Using data supplied by our industry partner, (a multinational mining company), we show that this approach is reasonably tractable, and demonstrate the improvements that can be made to mine schedules through the explicit use of multiple geological estimates.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

ORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming

Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...

متن کامل

An imperialist competitive algorithm for solving the production scheduling problem in open pit mine

Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...

متن کامل

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008