On the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines
نویسنده
چکیده
We consider the ordinary NP-hard two-machine flow shop problem with the objective of determining simultaneously a minimal common due date and the minimal number of tardy jobs. In [S. S. Panwalkar, C. Koulamas, An O(n) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines, European Journal of Operational Research 221 (2012), 7–13.], the authors presented quadratic algorithm for the problem when each job has its smaller processing time on the first machine. In this note, we improve the running time of the algorithm to O(n log n) using recently introduced modified binary tree data structure. Furthermore, we present O(n) algorithm for the scheduling sequence minimizing makespan for the no-wait variant.
منابع مشابه
Bicriteria models to minimize the total weighted number of tardy jobs with convex controllable processing times and common due date assignment
We study a single-machine scheduling problem in a flexible framework where both job processing times and due dates are decision variables to be determined by the scheduler. The model can also be applied for quoting delivery times when some parts of the jobs may be outsourced. We analyze the problem with common due date assignment and a convex resource consumption function. We provide a bicriter...
متن کاملA Mathematical Analysis on Linkage of a Network of Queues with Two Machines in a Flow Shop including Transportation Time
This paper represents linkage network of queues consisting of biserial and parallel servers linked to a common server in series with a flowshop scheduling system consisting of two machines. The significant transportation time of the jobs from one machine to another is also considered. Further, the completion time of jobs/customers (waiting time + service time) in the queue network is the set...
متن کاملMinimizing the Expected Number of Tardy Jobs in Dynamic Flow Shop with Stochastic Due Dates
The problem of minimizing the expected number of tardy jobs in a dynamic m machine flow shop i.e., Fm�rj�E�∑Uj� is studied in this research. It is assumed that the jobs with deterministic processing times and stochastic due dates arrive dynamically and randomly to the flow shop cell. The due date of each job is assumed to be normally distributed with known mean and variance. A dynamic method is...
متن کاملMinimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کاملElectromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and tardiness
In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Theor. Comput. Sci.
دوره 582 شماره
صفحات -
تاریخ انتشار 2015