Water Wave Optimization Algorithm for solving Thermal Unit Maintenance Scheduling

نویسندگان

  • M. Siva
  • R. Balamurugan
  • G. Balaji
چکیده

Maintenance scheduling of generating units is considered one of the vital power system problem for providing power in a reliable and economic way. In order to improve the overall availability of the generating units, chances of capacity shortage is to be reduced by performing preventive maintenance at regular intervals. In this paper, Hybrid integer coded Water Wave Optimization (HWWO) Algorithm is proposed for solving thermal unit maintenance scheduling (TUMS) problem. To demonstrate the efficacy of the proposed approach, two test systems having 4 units and 22 units are considered. The numerical simulation results prove the superiority of the proposed HWWO for solving TUMS problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Using Genetic Algorithm to Robust Multi Objective Optimization of Maintenance Scheduling Considering Engineering Insurance

Efficient and on-time maintenance plays a crucial role inreducing cost and increasing the market share of an industrial unit. Preventivemaintenance is a broad term that encompasses a set of activitiesaimed at improving the overall reliability and availability of a systembefore machinery breakdown. The previous studies have addressed thescheduling of preventive maintenance. These studies have co...

متن کامل

Optimal Scheduling of Coordinated Wind-Pumped Storage-Thermal System Considering Environmental Emission Based on GA Based Heuristic Optimization Algorithm

The integration of renewable wind and pumped storage with thermal power generation allows for dispatch of wind energy by generation companies (GENCOs) interested in participation in energy and ancillary services markets. However, to realize the maximum economic profit, optimal coordination and accounting for reduction in cost for environmental emission is necessary. The goal of this study is to...

متن کامل

Fuzzy Clustered Multi Objective Differential Evolution for Thermal Generator Maintenance Scheduling

Generator Maintenance Scheduling (GMS) problem in a vertically integrated electric utility system is considered in this paper. The cost and reliability objectives are included in the problem formulation. The GMS is formulated as a non linear, heavily constrained multi-objective optimization problem and the non dominated solutions are obtained using multi objective hybrid integer coded different...

متن کامل

Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint

Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...

متن کامل

A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem

Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017