Optimal Lead Time for Dengue Forecast

نویسندگان

  • Yien Ling Hii
  • Joacim Rocklöv
  • Stig Wall
  • Lee Ching Ng
  • Choon Siang Tang
  • Nawi Ng
چکیده

BACKGROUND A dengue early warning system aims to prevent a dengue outbreak by providing an accurate prediction of a rise in dengue cases and sufficient time to allow timely decisions and preventive measures to be taken by local authorities. This study seeks to identify the optimal lead time for warning of dengue cases in Singapore given the duration required by a local authority to curb an outbreak. METHODOLOGY AND FINDINGS We developed a Poisson regression model to analyze relative risks of dengue cases as functions of weekly mean temperature and cumulative rainfall with lag times of 1-5 months using spline functions. We examined the duration of vector control and cluster management in dengue clusters > = 10 cases from 2000 to 2010 and used the information as an indicative window of the time required to mitigate an outbreak. Finally, we assessed the gap between forecast and successful control to determine the optimal timing for issuing an early warning in the study area. Our findings show that increasing weekly mean temperature and cumulative rainfall precede risks of increasing dengue cases by 4-20 and 8-20 weeks, respectively. These lag times provided a forecast window of 1-5 months based on the observed weather data. Based on previous vector control operations, the time needed to curb dengue outbreaks ranged from 1-3 months with a median duration of 2 months. Thus, a dengue early warning forecast given 3 months ahead of the onset of a probable epidemic would give local authorities sufficient time to mitigate an outbreak. CONCLUSIONS Optimal timing of a dengue forecast increases the functional value of an early warning system and enhances cost-effectiveness of vector control operations in response to forecasted risks. We emphasize the importance of considering the forecast-mitigation gaps in respective study areas when developing a dengue forecasting model.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

To wait or not to wait: Optimal ordering under lead time uncertainty and forecast updating

There has been a dramatic increase over the past decade in the number of firms that source finished product from overseas. While this has reduced procurement costs, it has increased supply risk; procurement lead times are longer and are often unreliable. In deciding when and how much to order, firms must consider the lead time risk and the demand risk, i.e., the accuracy of their demand forecas...

متن کامل

Forecast of Dengue Incidence Using Temperature and Rainfall

INTRODUCTION An accurate early warning system to predict impending epidemics enhances the effectiveness of preventive measures against dengue fever. The aim of this study was to develop and validate a forecasting model that could predict dengue cases and provide timely early warning in Singapore. METHODOLOGY AND PRINCIPAL FINDINGS We developed a time series Poisson multivariate regression mod...

متن کامل

Three-Month Real-Time Dengue Forecast Models: An Early Warning System for Outbreak Alerts and Policy Decision Support in Singapore

BACKGROUND With its tropical rainforest climate, rapid urbanization, and changing demography and ecology, Singapore experiences endemic dengue; the last large outbreak in 2013 culminated in 22,170 cases. In the absence of a vaccine on the market, vector control is the key approach for prevention. OBJECTIVES We sought to forecast the evolution of dengue epidemics in Singapore to provide early ...

متن کامل

Singapore Success: New Model Helps Forecast Dengue Outbreaks

The island city-state of Singapore reported a record 2,441 cases of dengue fever in January 2016, triggered by all-time-high temperatures in the preceding weeks. Singapore is a potential hotbed for the widespread disease thanks to its tropical climate and highly urbanized environment. But it’s also a leader in mitigating the spread of dengue virus through an advanced mosquito control program, a...

متن کامل

Optimal Ordering Policy and Coordination Mechanism of a Supply Chain with Controllable Lead-Time-Dependent Demand Forecast

This paper investigates the ordering decisions and coordinationmechanism for a distributed shortlife-cycle supply chain. The objective is to maximize the whole supply chain’s expected profit and meanwhile make the supply chain participants achieve a Pareto improvement. We treat lead time as a controllable variable, thus the demand forecast is dependent on lead time: the shorter lead time, the b...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 6  شماره 

صفحات  -

تاریخ انتشار 2012