Optimal Preventive Maintenance Schedule based on Lifecycle Cost and Time-Dependent Reliability

نویسندگان

  • Jing Li
  • Zissimos P. Mourelatos
  • Amandeep Singh
چکیده

Reliability is an important engineering requirement for consistently delivering acceptable product performance through time. It also affects the scheduling for preventive maintenance. Reliability usually degrades with time increasing therefore, the lifecycle cost due to more frequent failures which result in increased warranty costs, costly repairs and loss of market share. In a lifecycle cost based design, we must account for product quality and preventive maintenance using time-dependent reliability. Quality is a measure of our confidence that the product conforms to specifications as it leaves the factory. For a repairable system, preventive maintenance is scheduled to avoid failures, unnecessary production loss and safety violations. This article proposes a methodology to obtain the optimal scheduling for preventive maintenance using time-dependent reliability principles. An optimization algorithm maximizes the time for preventive maintenance by improving the system reliability, so that the lifecycle cost stays below a specified target. The lifecycle cost includes a production, an inspection, and an expected variable cost. All costs depend on quality and/or reliability. Preventive maintenance is performed at the time when the improved reliability falls below an acceptable reliability target. The methodology also identifies the most critical component(s), or failure modes, which if repaired, will improve the system reliability the most. We demonstrate the proposed approach using an automotive roller clutch example.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimizing the preventive maintenance scheduling by genetic algorithm based on cost and reliability in National Iranian Drilling Company

The present research aims at predicting the required activities for preventive maintenance in terms of equipment optimal cost and reliability. The research sample includes all offshore drilling equipment of FATH 59 Derrick Site affiliated with National Iranian Drilling Company. Regarding the method, the research uses a field methodology and in terms of its objectives, it is classified as an app...

متن کامل

Reliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants

  Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...

متن کامل

An Optimal Preventive Maintenance Model to Enhance Availability and Reliability of Flexible Manufacturing Systems

General preventive maintenance model for the components of a system, which improves the reliability to ‘as good as new,’ was used to optimize the maintenance cost. The cost function of a maintenance policy was minimized under given availability constraint. On the other hand, in order to ensure appropriate reliability and availability, the development of the optimal maintenanc...

متن کامل

Optimal Estimation of Weibull Distribution Parameters in order to Provide Preventive-Corrective Maintenance Program for Power Transformers

In this paper, a new method for modelling and estimation of reliability parameters of power transformer components in distribution and transmission voltage levels for preventive-corrective maintenance schedule of transformers is proposed. In this method, with optimal estimation of Weibull distribution parameters using least squares method and input data uncertainty reduction, failure rate and p...

متن کامل

تعیین نوع و زمانبندی بهینه نگهداری و تعمیرات پیشگیرانه سیستمهای چند‌جزیی بر اساس قابلیت اطمینان

In this research, a model for optimal PM planning based on reliability is developed and solved for multi-component systems. In the proposed model, the type of PM actions for each inspection period is determined in such manner that the total weighted related costs are minimized while a minimum required system reliability is maintained. The planning horizon is divided into some inspections interv...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013