Design Aspects and Model studies for Silt Flushing Tunnels in Hydro Power Projects

نویسندگان

  • M K Verma
  • M Z Qamar
چکیده

The Himalayan Rivers due to their steep bed and side slopes, narrow width and fragile geology of the region carry huge amount of sediment with them. Many runof-river hydro power projects are coming up on these rivers and suspended sediment enters into the power intake of these projects. Desilting chambers are provided to remove / minimize the suspended sediment from water conductor system. The settled sediment in the desilting chamber is flushed out continuously through the flushing tunnels provided just below the chamber. These flushing tunnels carry the settled sediment laden water up to their outfall in river downstream of the dam. Various design parameters of silt flushing tunnels which can only be finalized, after conducting physical model studies are discussed in this paper. Keywords— Desilting chamber, sediment transport capacity silt flushing tunnel, suspended sediment concentration.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Importance of Desilting Basins in Run-of-River Hydro Projects in Himalayan Region

The natural resources of Himalayas in terms of hydro power generation are not only crucial for the Himalayan states of India, but very important for the whole country. These states seem to be keen in exploiting their vast hydro electricity potential for net revenue earning. However, due to weak geological conditions and steep slopes these rivers carry a huge quantity of sediment with them. The ...

متن کامل

A New Approach for the Study of Silt Erosion of Hydro Turbine

Turbine is the most important part of hydro power plant which converts the potential energy of water into mechanical energy. The presence of silt in water erodes the turbine material. Erosion of turbine decreases the performance of turbine, life of the turbine as well as loss of power generation. This paper presents a new approach for the study of silt erosion of hydro turbine. In this study, w...

متن کامل

Soil-Interaction of Intake Pressure Tunnels under Ground Strength Reduction Conditions due to Cracking of the Lining (Case study: Dasht-e-Abbas intake pressure tunnel)

The induced cracks on the concrete lining of the intake pressure tunnels may cause the water seep into the surrounding media leading to develop a hydro pressure on the external surface of the lining. In the common design practice, the lining can be designed to tolerate with this pressure using the Schleiss method. However, when the tunnel is constructed above the underground water, the seepage ...

متن کامل

One dimensional simulation of flushing sediment through reservoirs

Control of sedimentation in reservoirs of dams is considered to be one of the most important issues in exploitation of dams and increasing their useful life. Reservoirs act as traps for sediments and prevent transport of sediments to the river. The deposited sediments will decrease the capacity of the reservoirs so that they cannot be in use any more. Various methods are discussed in this study...

متن کامل

Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method

Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013