Sub-transmission sub-station expansion planning based on bacterial foraging optimization algorithm
In recent years, significant research efforts have been devoted to the optimal planning of power systems. Substation Expansion Planning (SEP) as a sub-system of power system planning consists of finding the most economical solution with the optimal location and size of future substations and/or feeders to meet the future load demand. The large number of design variables and combination of discr...
متن کاملیکپارچه سازی برنامهریزی و زمانبندی تولید در صنایع فرآیندی چند محصولی با سیستم تولیدی پیوسته
One of the main elements of each supply chain is production. Production planning in multi-products process industries in which products are subjected to the complicated operational constraints is a very hard work because production of computed optimal volume should be compatible with operation scheduling constraints of production system. Thus, integration idea has been proposed for required d...
متن کاملA MULTISTAGE EXPANSION PLANNING METHOD FOR OPTIMAL SUBSTATION PLACEMENT
Optimal distribution substation placement is one of the major components of optimal distribution system planning projects. In this paper optimal substation placement problem is solved using Imperialist Competitive Algorithm (ICA) as a new developed heuristic optimization algorithm. This procedure gives the optimal size, site and installation time of medium voltage substation, using their relate...
متن کاملA Decision Support System for Urban Journey Planning in Multimodal Public Transit Network
The goal of this paper is to develop a Decision Support System (DSS) as a journey planner in complex and large multimodal urban network called Rahyar. Rahyar attempts to identify the most desirable itinerary among all feasible alternatives. The desirability of an itinerary is measured by a disutility function, which is defined as a weighted sum of some criteria. The weight...
متن کاملMulti-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)
In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Annals OR
دوره 138 شماره
صفحات -
تاریخ انتشار 2005