The TEMPORA Approach: Information Systems Development Based on Explicit Business Rules with Time

نویسنده

  • Benkt Wangler
چکیده

This paper provides an account of the project TEMPORA, run from 1989 to 1994 and sponsored by the European Union, in which the Swedish Institute for Systems Development (SISU) and the research institute SINTEF from Norway were two of the partners. The project aimed at developing a prototypical systems development environment that involved the time dimension and it was based on the explicit representation of business rules. The Nordic partners played important roles in the project, in designing, building, and evaluating modeling formalisms and tools, as well as in designing methodological support.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The TEMPORA Deductive Repository: Metamodelling and Validation Support

In this paper, the development of the TEMPORA Metamodel in the deductive Database Management System MegaLog is described. This provides the basis for the development of an analysis tool for verification and validation of the TEMPORA specification. The functionality of this analysis tool with respect to the verification and validation of business rules expressed in the Conceptual Rule Language (...

متن کامل

Assessment of BAM with ANP Approach; Case Study: Bank Sepah

In today's business environment in which coordination and adaptation with constant changes are the only ways of survival, real-time monitoring of activities and making the decisions accordingly are necessary. Since performance measurement cannot be managed independent of business processes, Business Activity Monitoring (BAM) systems should monitor performance metrics based on business processes...

متن کامل

Assessment of BAM with ANP Approach; Case Study: Bank Sepah

In today's business environment in which coordination and adaptation with constant changes are the only ways of survival, real-time monitoring of activities and making the decisions accordingly are necessary. Since performance measurement cannot be managed independent of business processes, Business Activity Monitoring (BAM) systems should monitor performance metrics based on business processes...

متن کامل

The Effects of Audit Methodology on the Development of Auditors’ Knowledge of the Client’s Business

This study examines the differences between strategic systems audit approach compared with traditional based audit approach and its impact on development of auditors’ knowledge of the client’s business, has been discussed. Strategic systems audit approach advocates argue that this approach creates a better development of auditors’ knowledge of the client’s business than the traditional-based au...

متن کامل

Verification and Validation of Temporal Business Rules

In this paper the development of an analysis tool for verification and validation of temporal business rules is described. The formalism for expressing the business rules is the Conceptual Rule Language developed as part for the ESPRIT II project TEMPORA.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010