Ergonomics program management in Tucuruí Hydropower Plant using TPM methodology.

نویسندگان

  • R M Santos
  • A C Sassi
  • B M Sá
  • S A Miguez
  • A A Pardauil
چکیده

This paper aims to present the benefits achieved in the ergonomics process management with the use of the TPM methodology (Total Productive Maintenance) in Tucuruí Hydropower Plant. The methodology is aligned with the corporate guidelines, moreover with the Strategic Planning of the company, it is represented in the TPM Pillars including the Health Pillar in which is inserted the ergonomics process. The results of the ergonomic actions demonstrated a 12% reduction over the absenteeism rate due to musculoskeletal disorders, solving 77,0% of ergonomic non-conformities, what favored the rise of the Organizational Climate in 44,8%, impacting on the overall performance of the company. Awards confirmed the success of the work by the achievement of the Award for TPM Excellence in 2001, Award for Excellence in Consistent TPM Commitment in 2009 and more recently the Special Award for TPM Achievement, 2010. The determination of the high rank administration and workers, allied with the involvement/dynamism of Pillars, has assured the success of this management practice in Tucuruí Hydropower Plant.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Impact of floating platforms on the limnological aspects of hydropower plant reservoirs

Floating platforms at the hydropower plant reservoirs are attractive sites for aquaculture, fishing and other recreational activities. However, the unregulated construction of these platforms may negatively affect the fauna, flora and water quality of reservoirs. Thus, this study aimed to evaluate the impact of floating platforms on the limnological aspects of Nova Ponte hydropower plant reserv...

متن کامل

Optimal Sizing of Low Head Hydropower Plant- A Case Study of Hydropower Project at Head of UCC (Lower) at Bambanwala

Pakistan is facing serious shortfall of electricity for few decades. Small hydropower projects can alleviate the worsening situation. The sizing of a low head hydropower plant plays a vital role in establishing the feasibility of the project. The plant needs to be optimized for energy produced, efficiencies of the plant components, number of units and its financial/economic parameters. This pap...

متن کامل

From Theory to Practice: a Total Ergonomics Model of a Manufacturing System

The objective of this paper is three fold. First, a general framework for development of total ergonomics model is introduced. Second, it is described how total ergonomics model may be applied in practice to intensify the productivity and working conditions of manufacturing systems. Third, it is shown whether the total ergonomics model is superior to the conventional ergonomics approach. This s...

متن کامل

A MATLAB / SIMULINK BASED FAULT ANALYSIS OF SMALL HYDROPOWER PLANT

ABSTRACTRenewable Energy Sources (RES) are well – defined as energy sources, that are in abundance within the natural surroundings and are much inexhaustible. In addition, hydroelectricity (HE) is a vital part of world renewable energy supply and hydropower remains a bulk source of electricity generation because of its environmental friendliness in nature. Modeling is the analysis of the ...

متن کامل

Computer-Aided Optimization in Operation Planning of Hydropower Plants – Algorithms and Examples

Due to complex relations present in hydropower markets, and having in mind the specific role of hydropower in common electricity generation and transmission grid systems, it is impossible to identify a unified approach to hydropower plant management. The ever-changing market behavior also presents a problem for unification of methodologies and all this imposes the interpretation of hydropower p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Work

دوره 41 Suppl 1  شماره 

صفحات  -

تاریخ انتشار 2012