X-band Crab Cavities for the Clic Beam Delivery System

نویسندگان

  • G. Burt
  • V. Dolgashev
  • S. Tantawi
چکیده

The CLIC machine incorporates a 20 mrad crossing angle at the IP to aid the extraction of spent beams. In order to recover the luminosity lost through the crossing angle a crab cavity is proposed to rotate the bunches prior to collision. The crab cavity is chosen to have the same frequency as the main linac (11.9942 GHz) as a compromise between size, phase stability requirements and beam loading. It is proposed to use a HE11 mode travelling wave structure as the CLIC crab cavity in order to minimise beam loading and mode separation. The position of the crab cavity close to the final focus enhances the effect of transverse wake-fields so effective wake-field damping is required. A damped detuned structure is proposed to suppress and de-cohere the wake-field hence reducing their effect. Design considerations for the CLIC crab cavity will be discussed as well as the proposed high power testing of these structures at SLAC.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Design of a nal focus system for CLIC in the multi-bunch regime

We present a design for the CLIC nal focus system which authorizes the stable multi-bunch operation with a 5 mrad crossing-angle. The loss of luminosity is limited to less than 20% in such a way that crab-crossing cavities may not be required. The main feature of the design is that the vertically focusing nal quadrupole is split into a 48 mm large bore superconducting quadrupole and a 13.7 mm b...

متن کامل

TWO-FREQUENCY BEAM-LOADING COMPENSATION in the DRIVE- BEAM ACCELERATOR of the CLIC TEST FACILITY

The CLIC Test Facility (CTF) is a prototype two-beam accelerator, in which a high-current “drive beam” is used to generate the RF power for the main-beam accelerator. The drive-beam accelerator consists of two S-band structures which accelerate a bunch train with a total charge of 500 nC. The substantial beam loading is compensated by operating the two accelerating structures at 7.81 MHz above ...

متن کامل

A 12 Ghz 50mw Klystron for Support of Accelerator Research*

A 12 GHz 50MW X-band klystron is under development at the SLAC National Accelerator Laboratory Klystron Department. The klystron will be fabricated to support programs currently underway at three European Labs; CERN, PSI, and INFN Trieste. The choice of frequency selection was due to the CLIC RF frequency changing from 30 GHz to the European X-band frequency of 11.99 GHz in 2008. Since the Klys...

متن کامل

Crab-cavity Beam Dynamics Issues for an Lhc Upgrade

Modern colliders bring into collision a large number of bunches per pulse or per turn to achieve a high luminosity. The long-range beam-beam effects arising from parasitic encounters at such colliders are mitigated by introducing a crossing angle. Under these conditions, crab cavities can be used to restore effective head-on collisions and thereby to increase the geometric luminosity. Crab cavi...

متن کامل

A Versatile Beam Loss Monitoring System for Clic

The design of a potential CLIC beam loss monitoring (BLM) system presents multiple challenges. To successfully cover the 48 km of beamline, ionisation chambers and optical fibre BLMs are under investigation. The former fulfils all CLIC requirements but would need more than 40000 monitors to protect the whole facility. For the latter, the capability of reconstructing the original loss position w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008