Estimating With Objects - Part VII

ثبت نشده
چکیده

This column is the seventh in a series about estimating. The first was in the July 1996 issue. The most recent several columns have focused on estimates based on lines of code (LOC). There are, however, several types of source code as well as many other important product types. Examples are new, modified, and reused code, as well as documentation, screens, reports, and files. The principal question addressed by this column is: What are the most important product types to consider, and how do you estimate them?

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Preparation of factor VII concentrate using CNBr-activated

  Background: Factor VII concentrates are used in patients with congenital or acquired factor VII deficiency or treatment of hemophilia patients with inhibitors. In this research, immunoaffinity chromatography was used to purify factor VII from prothrombin complex (Prothrombin-Proconvertin-Stuart Factor-Antihemophilic Factor B or PPSB) which contains coagulation factors II, VII, IX and X. The a...

متن کامل

Visual Information for Inducing Interactivity and Presence

One of the most important goals in the design of virtual environments (VE) is to give the user the feeling of existence within the VE, known as presence. There have been numerous studies on presence, and it has been known that interaction with virtual objects plays a significant role in enhancing presence. Taken out of context, however, such a statement can be confusing, because interactions ar...

متن کامل

Modeling Particle Resuspension for Estimating Exposure to Bacillus Spores

.......................................................................................................................................... iii List of Figures ................................................................................................................................. vii List of Tables ............................................................................................

متن کامل

Estimating With Objects - Part II

This column discusses program size and it provides a general background for all the columns to follow. Before discussing size estimating, it is important to cover size measurement. The discussion of size estimating starts next month. To repeat what I said last month, if you are in a hurry to get to the punch line, this set of columns describes an estimating method called PROBE which is describe...

متن کامل

Compare the MPSIAC and EPM Models for Estimating Erosion and Sediment in poorahmadi catchment

to estimating erosion and sediment in the Poorahmadi watershed basin, MPSIAC and EPM models was used and compared.  Part of Required data about natural characteristics of studing watershed basin provided from comprehensive studies of Watershed Basin and the other part prepared through digital image processing and preparing required maps  using RS and GIS joint capabilities.  With calculating th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1997