The time trade-off: a note on the effect of lifetime reallocation of consumption and discounting.
نویسندگان
چکیده
This paper considers the extent to which responses to time trade-off (TTO) questions can provide unbiased estimates of ratios of individual marginal rates of substitution (MRS) of wealth for risk of various health state impairments relative to the corresponding MRS for risk of death. It is shown that if there is reallocation of lifetime consumption and/or discounting of future utilities, then a TTO response that is not adjusted for these effects will unambiguously overestimate the ratios of individual MRS. While the effect of reallocation is likely to be very small, discounting can lead to significant overestimation, the magnitude of which depends in part upon the severity of the health state impairment.
منابع مشابه
EOQ Model with Cash Flow Oriented and Quantity Dependent Under Trade Credits (TECHNICAL NOTE)
Inventory models in which the demand rate dependents on the stock- dependent are based on the common real- life observation that greater product availability tends to stimulate more sales. In this study we develop an inventory model to determine an optimal ordering policy for quantity dependent demand rate and time dependent holding cost items with delay in payments permitted by the supplier un...
متن کاملA JOINT DUTY CYCLE SCHEDULING AND ENERGY AWARE ROUTING APPROACH BASED ON EVOLUTIONARY GAME FOR WIRELESS SENSOR NETWORKS
Network throughput and energy conservation are two conflicting important performance metrics for wireless sensor networks. Since these two objectives are in conflict with each other, it is difficult to achieve them simultaneously. In this paper, a joint duty cycle scheduling and energy aware routing approach is proposed based on evolutionary game theory which is called DREG. Making a trade-off ...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملA Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem
Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each act...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Journal of health economics
دوره 16 6 شماره
صفحات -
تاریخ انتشار 1997