Towards Tight Lower Bounds for Scheduling Problems
نویسندگان
چکیده
We show a close connection between structural hardness for k-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite structural hardness result of [1], we obtain a hardness of 2 − for the problem of minimising the makespan for scheduling precedence-constrained jobs with preemption on identical parallel machines. This matches the best approximation guarantee for this problem [6,4]. Assuming the same hypothesis, we also obtain a super constant inapproximability result for the problem of scheduling precedence-constrained jobs on related parallel machines, making progress towards settling an open question in both lists of ten open questions by Williamson and Shmoys [17], and by Schuurman and Woeginger [14]. The study of structural hardness of k-partite graphs is of independent interest, as it captures the intrinsic hardness for a large family of scheduling problems. Other than the ones already mentioned, this generalisation also implies tight inapproximability to the problem of minimising the weighted completion time for precedence-constrained jobs on a single machine, and the problem of minimising the makespan of precedenceconstrained jobs on identical parallel machine, and hence unifying the results of Bansal and Khot[1] and Svensson [15], respectively.
منابع مشابه
Lower Bounds on Precedence-Constrained Scheduling for Parallel Processors
We consider two general precedence-constrained scheduling problems that have wide applicability in the areas of parallel processing, high performance compiling, and digital system synthesis. These problems are intractable so it is important to be able to compute tight bounds on their solutions. A tight lower bound on makespan scheduling can be obtained by replacing precedence constraints with r...
متن کاملComputer-Aided Way to Prove Theorems in Scheduling
Аннотация For two scheduling problems (O3||Cmax and AL3||Cmax) tight bounds of the optima localization intervals are found in terms of lower bounds (C̃ and Ĉ, respectively) computable in linear time. The main part of the proof was made with an aid of computer. As a by-product, we obtain linear-time approximation algorithms for solving these problems with worst-case performance ratios 4/3 and 5/3...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملA Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations
In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...
متن کاملذخیره در منابع من