An improved heuristic for permutation flowshop scheduling

نویسندگان

  • Uday Kumar Chakraborty
  • Dipak Laha
چکیده

Flowshop scheduling deals with determination of optimum sequence of jobs to be processed on some machines in a fixed order so as to satisfy certain scheduling criteria. The general problem of scheduling has been shown to be NP-complete. Exact algorithms, such as integer programming and branch-and-bound, guarantee optimality but do not yield the optimum solution in polynomial time even for problems of small size. Heuristics have been shown to yield good working solutions (not necessarily optimal) in reasonable time. Although much research on the flowshop problem has been done over several decades starting from Johnson’s algorithm, only a few good algorithms exist. The Nawaz-Enscore-Ham heuristic, used for minimisation of makespan, continues to be the most popular algorithm because of its simplicity, solution quality and time-complexity. In the present paper we have modified the NEH algorithm, achieving significant improvement in the quality of the solution while maintaining the same algorithmic complexity. The proposed approach derives its strength from the use of a population-based technique. Experimental comparisons have been made on a large number of randomly generated test problems of varying problem sizes. Our approach is shown to outperform both the original NEH and NEH’s best-known competitor to date, the HFC heuristic. Statistical tests of significance are performed to substantiate the claims of improvement.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

کمینه‌سازی حداکثر دیرکرد کارها در مسأله زمانبندی جریان کارگاهی جایگشتی دوباره وارد شونده چند ماشینه

  This investigation considers a reentrant permutation flowshop scheduling problem whose performance criterion is maximum tardiness. The reentrant flowshop (RFS) is a natural extension of the classical flowshop by allowing a job to visit certain machines more than once. The RFS scheduling problem, in which the job order is the same for each machine in each layer, is called a reentrant permutati...

متن کامل

A Branch-and-Bound Based Heuristic Algorithm for Minimizing Makespan in Machining-Assembly Flowshop Scheduling

This paper proposes a heuristic algorithm, called list-based squeezing branch and bound algorithm, for solving a machine-fixed, machining-assembly flowshop scheduling problem to minimize makespan. The machine-fixed, machining-assembly flowshop consists of some parallel two-machine flow lines at a machining stage and one robot at an assembly stage. Since an optimal schedule for this problem is n...

متن کامل

A Constructive Genetic Algorithm for permutation flowshop scheduling

The general flowshop scheduling problem is a production problem where a set of n jobs have to be processed with identical flow pattern on m machines. In permutation flowshops the sequence of jobs is the same on all machines. A significant research effort has been devoted for sequencing jobs in a flowshop minimizing the makespan. This paper describes the application of a Constructive Genetic Alg...

متن کامل

A New Heuristic Method for Minimizing the Makespan in a No-idle Permutation Flowshop

This paper deals with the no-idle permutation flowshop sequencing in order to minimize the total time of completing the schedule (makespan). A heuristic denoted by NB is introduced, which is compared with the best heuristics reported in the literature. An extensive computational experiment was carried out for the performance evaluation of the proposed heuristic. Experimental results clearly sho...

متن کامل

A New Heuristic-em for Permutation Flowshop Scheduling

This paper applies the new developed heuristic electromagnetism-like mechanism (EM) algorithm for the permutation flowshop scheduling problem. This algorithm simulates the electromagnetism theory by considering each solution as an electrical charge. Through the attraction-repulsion of the charges, solutions move to the optimality without being trapped into local optima. We make use of random ke...

متن کامل

MILP models and valid inequalities for the two-machine permutation flowshop scheduling problem with minimal time lags

In this paper, we consider the problem of scheduling on two-machine permutation flowshop with minimal time lags between consecutive operations of each job. The aim is to find a feasible schedule that minimizes the total tardiness. This problem is known to be NP-hard in the strong sense. We propose two mixed-integer linear programming (MILP) models and two types of valid inequalities which aim t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • IJICT

دوره 1  شماره 

صفحات  -

تاریخ انتشار 2007