Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
نویسندگان
چکیده
We consider the feasibility model of multi-agent scheduling on a single machine, where each agent’s objective function is to minimize the total weighted number of tardy jobs. We show that the problem is strongly NP-complete in general. When the number of agents is fixed, we first show that the problem can be solved in pseudo-polynomial time for integral weights, and can be solved in polynomial time for unit weights; then we present a fully polynomial-time approximation scheme for the problem.
منابع مشابه
A branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem
In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery. jobs have to be scheduled on a single machine and delivered to customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA...
متن کاملMinimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کاملArtificial Immune System for Single Machine Scheduling and Batching Problem in Supply Chain
This paper addresses a production and outbound distribution scheduling problem in which a set of jobs have to be process on a single machine for delivery to customers or to other machines for further processing. We assume that there is a sufficient number of vehicles and the delivery costs is independent of batch size but it is dependent on each trip. In this paper, we present an Artificial Imm...
متن کاملA Survey of Single Machine Scheduling to Minimize Weighted Number of Tardy Jobs
This paper presents a review of single machine scheduling to minimize the weighted number of tardy jobs. The problem involves processing n jobs on a single machine, each having processing time pj and due date dj . The aim is to schedule the jobs to meet their due date. A job is tardy if the completion time of job j is Cj > dj and on-time otherwise. This paper assesses works done to minimize the...
متن کاملBatch scheduling to minimize the weighted number of tardy jobs
In this paper, we address a single-machine scheduling problem with due dates and batch setup times to minimize the weighted number of tardy jobs. We give a pseudo-polynomial dynamic program and a fully-polynomial approximation scheme for the case where the due dates are uniform within a family. 2007 Elsevier Ltd. All rights reserved.