NIMART rollout to primary healthcare facilities increases access to antiretrovirals in Johannesburg: an interrupted time series analysis.

نویسندگان

  • J C Y Nyasulu
  • E Muchiri
  • S L Mazwi
  • M Ratshefola
چکیده

INTRODUCTION South Africa has made remarkable progress in rolling out antiretroviral therapy (ART), with the largest number of people (more than 1.4 million) enrolled on antiretroviral in the world. Decentralisation of services to primary health centres (PHCs) has strengthened retention of patients on ART and reduced the burden of managing uncomplicated cases at referral hospitals. METHODS This was a ten-step Nurse Initiation Management of Antiretroviral Treatment (NIMART) rollout intervention in which nurses from 17 primary healthcare facilities of Region F, City of Johannesburg, South Africa, were trained and mentored in NIMART by the Wits Reproductive Health and HIV Research Institute (WRHI) to commence patients on ART in their PHCs. A total of 20 535 patients initiated ART during the 30-month study period. Monthly initiations at both PHCs and referral clinics were monitored. To test the statistical significance of the impact of NIMART rollout on the referral hospital initiations and Region F monthly initiations, interrupted time series analysis was applied. FINDINGS Ten-step NIMART was applied, with the first step being establishment of NIMART as a priority in order to obtain primary buy-in by the Department of Health (DoH) and City of Johannesburg (CoJ). Forty-five professional nurses were trained in NIMART by WRHI quality improvement mentors. By the end of September 2011, all 17 PHCs in Region F were initiating patients on ART. Total initiations significantly increased by 99 patients immediately after NIMART rollout (p=0.013) and continued to increase by an average of 9 every month (p=0.013), while referral facility initiations decreased by 12 (p=0.791) immediately after NIMART and then decreased by an average of 18 every month (p=0.01). CONCLUSION In this study, decentralisation of ART initiation by professional nurses was shown to increase ART uptake and reduce workload at referral facilities, enabling them to concentrate on complicated cases. However, it is important to ensure capacity building, training and mentoring of nurses to integrate HIV services in order to reduce workload and provide a comprehensive package of care to patients. Engaging and having buy-in from DoH/CoJ partners in rolling out NIMART was crucial in increasing outputs as well as for sustainability of the NIMART programme.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Nurse and manager perceptions of nurse initiated and managed antiretroviral therapy (NIMART) implementation in South Africa: a qualitative study

OBJECTIVE To explore nurse and facility and programme manager perceptions of nurse initiated and managed antiretroviral therapy (NIMART) implementation in Gauteng, South Africa. DESIGN In this qualitative study, in-depth interviews and focus group discussions were conducted to gain insight into participants' experiences of NIMART implementation. SETTING Participants came from urban, peri-ur...

متن کامل

Determinants of Healthcare Utilisation and Out-of-Pocket Payments in the Context of Free Public Primary Healthcare in Zambia

Background Access to appropriate and affordable healthcare is needed to achieve better health outcomes in Africa. However, access to healthcare remains low, especially among the poor. In Zambia, poor access exists despite the policy by the government to remove user fees in all primary healthcare facilities in the public sector. The paper has two main objectives: (i) to examine the factors assoc...

متن کامل

تحلیلی بر عدالت فضایی و کاربری های درمانی مبتنی بر GIS مطالعه موردی: کلانشهر تبریز

Background:  Equitable and suitable access of all citizens to the urban public service is one of the primary principles of urban planning, which with the rise of the justice-centered approaches in recent decades has been double care. In the meantime, access to health services as one of the vital public service has greater sensitivity. This research has been performed with aim of identify enjoye...

متن کامل

Finite Sample Properties of Quantile Interrupted Time Series Analysis: A Simulation Study

Interrupted Time Series (ITS) analysis represents a powerful quasi-experime-ntal design in which a discontinuity is enforced at a specific intervention point in a time series, and separate regression functions are fitted before and after the intervention point. Segmented linear/quantile regression can be used in ITS designs to isolate intervention effects by estimating the sudden/level change (...

متن کامل

Evaluation of Community Interventions in Changes in Incidence of Cutaneous Leishmaniasis in Isfahan Province from 2002 to 2018: An Interrupted Time Series Regression Analysis

Background and Objectives: Due to the importance of cutaneous leishmaniasis, the national leishmaniasis project began in 2007 in Iran. The aim of the present study was to evaluate community interventions in changes in the incidence of cutaneous leishmaniasis in Isfahan Province from 2002 to 2018: an Interrupted time series regression analysis.   Materials and Methods: The present study was a ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • South African medical journal = Suid-Afrikaanse tydskrif vir geneeskunde

دوره 103 4  شماره 

صفحات  -

تاریخ انتشار 2012