Exact and Approximation Algorithms for Makespan Minimization on Unrelated Parallel Machines
نویسندگان
چکیده
The NP-hard problem addressed in this paper is well known in the scheduling literature as Rl( C,,,. We propose lower bounds based on Lagrangian relaxations and additive techniques. We then introduce new cuts which eliminate infeasible disjunctions on the cost function value, and prove that the bounds obtained through such cuts dominate the previous bounds. These results are used to obtain exact and approximation algorithms. Computational experiments show that they outperform the most effective algorithms from the literature.
منابع مشابه
A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times
In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...
متن کاملFlexible flowshop scheduling with equal number of unrelated parallel machines
This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...
متن کاملSolving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization
This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...
متن کاملParallel machine scheduling with nested job assignment restrictions
We derive a polynomial time approximation scheme for a special case of makespan minimization on unrelated machines. © 2009 Elsevier B.V. All rights reserved.
متن کاملA bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Discrete Applied Mathematics
دوره 75 شماره
صفحات -
تاریخ انتشار 1997