A Research Review on Building Information Modeling in Construction―An Area Ripe for IS Research
نویسندگان
چکیده
منابع مشابه
Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System
The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...
متن کاملAssessment of the completeness of Volunteered Geographic Information focusing on building blocks data (Case Study: Tehran metropolis)
Open Street Map (OSM) is currently the largest collection of volunteered geographic data, widely used in many projects as an alternative to or integrated with authoritative data. However, the quality of these data has been one of the obstacles to the widely use of it. In this article, from among the elements related to the quality of volunteered geographic data, we have tried to examine the com...
متن کاملTol-e Ājori, a new monumental building in Pārsa, a multidiscipline approach to Persepolis and Pārsa
The Bāgh-e Fīrūzi area spreads over 130 ha and includes 10 known Achaemenid sites: seven with stone architectural elements, one with baked bricks on the surface, and two corresponding to 3 m-high rounded tepes. Tol-e Ājori is located on the eastern fringe of Bāgh-e Fīrūzi, on a border defined by Bāgh-e Fīrūzi located 300 m to the SE and Tol-e Jangī B located 400 m to the NW. This area was studi...
متن کاملTol-e Ājori, a new monumental building in Pārsa, a multidiscipline approach to Persepolis and Pārsa
The Bāgh-e Fīrūzi area spreads over 130 ha and includes 10 known Achaemenid sites: seven with stone architectural elements, one with baked bricks on the surface, and two corresponding to 3 m-high rounded tepes. Tol-e Ājori is located on the eastern fringe of Bāgh-e Fīrūzi, on a border defined by Bāgh-e Fīrūzi located 300 m to the SE and Tol-e Jangī B located 400 m to the NW. This area was studi...
متن کاملReducing rework and increasing the civil projects quality, through Total Quality Management (TQM), by using the concept of building information modeling (BIM)
One of the important problems in the field of Construction Industry is ‘rework’. It affects time, costs, quality, and almost every criteria of project success. As a result of rework and ineffective use of resources and materials in the workshops, there is always a considerable loss of resources, materials, investments, and workforce-time. Designing and planning through full awareness of clients...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- CAIS
دوره 31 شماره
صفحات -
تاریخ انتشار 2012