Lhc Maintenance Policy and Requirements
نویسندگان
چکیده
In view of the very complex equipment making up the LHC machine and its many ancillary subsystems, equipment maintenance policies will play a primordial role to ensure an optimal availability. As access to most of the machine systems is strictly regulated, maintenance interventions will require global co-ordination and collaboration from both CERN equipment groups and industrial support teams. The talk will briefly touch on the different main systems and technical infrastructure involved and what is presently known about their operations and maintenance policy. Further extensions to the LHC QAP on the operations and maintenance phase will be mentioned. Issues like mean-time to repair, spares and contractual piquet service will become of major importance already in the installation phase. A rapid introduction and some examples from CERN’s asset tracking and maintenance system (MP5) will show what support can be expected from an industrial approach to maintenance issues.
منابع مشابه
Experience with the Gts-lhc Ion Source
For the heavy ion programme of the LHC a new ECRIS type heavy ion source had to be designed and built for Linac3 to fullfill the intensity requirements. Experience acquired during the installation and commissioning of the source and during operation for the LEIR ring commissioning will be presented. The performance of the source and its reliability are evaluated. Further requirements for high r...
متن کاملDetermining maintenance system requirements by viewpoint of availability and lean thinking: A MODM approach
Since lean concept has appeared many works have been done on decreasing or even eliminating of wastes such as extra inventory. Although these studies have not taken into account expected availability seriously. So in this paper, a Multiple Objective Decision Making (MODM) model has been developed by viewpoint of these subjects. They are decreasing wastes and increasing system availability. Wast...
متن کاملComparative assessment of manual load lifting tasks in three methods: KIM-LHC, WISHA and SNOOK tables: Case study in printing industry
Background: today, musculoskeletal disorders are considered as a serious threat for workers, and one of the main activities, which leads to these problems, is lifting tasks. Moreover, workers in printing industry are widely involved in inappropriate postures and lifting loads. The aim of this study was to compare the results of assessment of lifting tasks with KIM-LHC, WISHA and Snook tables in...
متن کاملReliability Based Maintenance and Human Resources Work-Rest Scheduling in Manufacturing System
In today's competitive market, all manufacturers attempt to improve their maintenance policy in order to decrease the cost of failure and increase the quality of products, but most of these attempts do not consider the role of humans involved in a manufacturing system. Human resources are the main factor in manufacturing that has an undeniable effect on products quality, machines reliability, s...
متن کاملAdaptive policy of buffer allocation and preventive maintenance actions in unreliable production lines
The buffer allocation problem is an NP-hard combinatorial optimization problem, and it is an important design problem in manufacturing systems. The research proposed in this paper concerns a product line consisting of n unreliable machines with n − 1 buffers and a preventive maintenance policy. The focus of the research is to obtain a better trade-off between the buffer level ...
متن کامل