Generating a Visual System with Soft Layout Constraints

نویسندگان

  • Sucktae Joung
  • Jiro Tanaka
چکیده

We developed a visual system generator called “Rainbow” which can handle layout constraints. The system can interactively layout figures while parsing them and make the parsed figures more understandable. Rainbow can deal with “soft layout constraints.” Soft layout constraints automatically layout entire figures by using graph drawing algorithms. Soft layout constraints are more flexible than constraints that determine coordinates and distances between figure elements. We have implemented three kinds of soft layout constraints: the spring model constraint, magnetic spring model constraint, and tree structure constraint. We use the spring model constraint to layout an undirected graph. The magnetic spring model constraint is used to layout a directed/undirected graph by controlling the orientation of an edge. The tree structure constraint is used to layout a graph in a tree structure. We will show two examples, “organization diagrams” and “E-R diagrams.”

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Using Markov Chain to Analyze Production Lines Systems with Layout Constraints

There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines need a precise planning to reduce volume in particular situation of lin...

متن کامل

برنامه‌ریزی همزمان انرژی و ذخیره‌ کنترل فرکانس اولیه با لحاظ کردن قابلیت‌های فنی واحدهای نیروگاهی پیشرفته

Load frequency control includes the operating system and functions that provide real time balance of load and generation. On the other hand, depending on technical capabilities and operational constraints, generating units may be classified for participating in frequency control. Simultaneous scheduling of generation together with primary reserve, in market based power system, has been investig...

متن کامل

Generating Optimal Timetabling for Lecturers using Hybrid Fuzzy and Clustering Algorithms

UCTTP is a NP-hard problem, which must be performed for each semester frequently. The major technique in the presented approach would be analyzing data to resolve uncertainties of lecturers’ preferences and constraints within a department in order to obtain a ranking for each lecturer based on their requirements within a department where it is attempted to increase their satisfaction and develo...

متن کامل

FORM FINDING FOR RECTILINEAR ORTHOGONAL BUILDINGS THROUGH CHARGED SYSTEM SEARCH ALGORITHM

Preliminary layout design of buildings has a substantial effect on the ultimate design of structural components and accordingly influences the construction cost. Exploring structurally efficient forms and shapes during the conceptual design stage of a project can also facilitate the optimum integrated design of buildings. This paper presents an automated method of determining column layout desi...

متن کامل

A NEW MEMETIC SWARM OPTIMIZATION FOR SPECTRAL LAYOUT DESIGN OF BRACED FRAMES

For most practical purposes, true topology optimization of a braced frame should be synchronized with its sizing. An integrated layout optimization is formulated here to simultaneously account for both member sizing and bracings’ topology in such a problem. Code-specific seismic design spectrum is applied to unify the earthquake excitation. The problem is solved for minimal structural weight un...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000