Matching based very large-scale neighborhoods for parallel machine scheduling
نویسندگان
چکیده
In this paper we study very large-scale neighborhoods for the minimum total weighted completion time problem on parallel machines, which is known to be strongly NP-hard. We develop two different ideas leading to very large-scale neighborhoods in which the best improving neighbor can be determined by calculating a weighted matching. The first neighborhood is introduced in a general fashion using combined operations of a basic neighborhood. Several examples for basic neighborhoods are given. The second approach is based on a partitioning of the job sets on the machines and a reassignment of them. In a computational study we evaluate the possibilities and the limitations of the presented very large-scale neighborhoods.
منابع مشابه
Very Large-Scale Neighborhoods with Performance Guarantees for Minimizing Makespan on Parallel Machines
We study the problem of minimizing the makespan on m parallel machines. We introduce a very large-scale neighborhood of exponential size (in the number of machines) that is based on a matching in a complete graph. The idea is to partition the jobs assigned to the same machine into two sets. This partitioning is done for every machine with some chosen rule to receive 2m parts. A new assignment i...
متن کاملA New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm
This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...
متن کاملMatching Based Exponential Neighborhoods For Parallel Machine Scheduling
We study the minimum total weighted completion time problem on parallel machines, which is known to be strongly NP-hard. We develop general ideas leading to exponential neighborhoods in which the best improving neighbor can be determined by calculating a maximum weighted matching of an improvement graph. In a second step we introduce neighborhoods that form the base for the exponential neighbor...
متن کاملTwo-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect
This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...
متن کاملDesign of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System
This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- J. Heuristics
دوره 17 شماره
صفحات -
تاریخ انتشار 2011