Tools to Improve the Process of Engineering Design: An Analysis of Team Configuration and Project Support by

نویسندگان

  • Paige E. Smith
  • Brian M. Kleiner
  • Maury Nussbaum
  • Eileen Van Aken
  • Bevlee A. Watford
چکیده

The purpose of this research was to determine how team design and project management (planning and tracking) affected planning and design performance and the people involved in the process. A laboratory study was conducted to evaluate three factors: team design (individuals versus groups of three), project support (no project support versus manual project support versus automated project support), and the engineering design life-cycle, which includes conceptual design, preliminary design, and detailed design. There were six observations per treatment, involving a total of 72 undergraduate engineering students. The impact of these factors were evaluated for planning time, design cycle time, cost effectiveness, cost variance, schedule variance, mental workload, and job satisfaction. For treatments that called for groups, group process was evaluated in addition to group workload. The results showed groups took 61% more time to plan their projects compared to individuals (p<0.01). Planning time was 31% longer for participants with manual support compared to those with automated project support (p<0.01). Schedule variance (p<0.01) and cost variance (p<0.001) decreased 24% and 23%, respectively, over time during the design process. The design cycle time was 17% longer for participants without project support compared to those with automated project support (p<0.05). During design, groups and individuals allocated their time differently (p<0.05). Mental workload, measured with the NASA Task Load Index (TLX), showed workload increased 16% over time (p<0.001). In addition, the combination of design phase and project tracking support affected the TLX (p<0.01). Job satisfaction was 5% lower at the end of the design project compared to the beginning of design (p<0.05). From the analysis on group process, the type of project support affected the group process during planning. Groups with manual support interacted 83% more than those with automated support (effective behaviors: p<0.01; ineffective behaviors: p<0.05). During design, the roles individuals played within the group affected how much they contributed to the group’s process (effective behaviors: p<0.0001; ineffective behaviors: p<0.01). There were several practical implications that can be drawn from this study. In the decision to use teams versus groups, there was evidence that groups were able to attend to more of the design requirements than individuals, which resulted in the design of systems with higher reliability. However the tradeoff of using groups were in the labor cost and in longer planning and status report meetings. Therefore the organization’s goals need to be carefully considered before selecting the team design. For project support, there were clear benefits to automating the planning process. Automation resulted in better Gantt chart and planning sessions that were completed more quickly compared to those with manual support. Furthermore, systems designed with automated support resulted in lower design costs compared to systems designed without project support.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

System Engineering Implementation Process for Super-Systems

System engineering is one of the most powerful tools for comprehensive project management and control. This tool emphasized the life cycle of the projects, manages every single activity and helps manage the main elements of the project through a set of management and engineering processes. The goal of the current study is to use a system engineering approach in design phase in order or to meet ...

متن کامل

An Analytic Model for Organization Readiness of Engineering Project Management Based on Virtual Teams

 The Organization Readiness of Engineering Project Management Based on Virtual Teams has been analyzed in an Iranian Engineering firm. Adapting and analyzing the latest readiness model, experts’ opinions were received by questionnaires and main criteria of the readiness have been identified. The considered readiness criteria are: Infrastructure, Deliverables (Drawings, Reports, Minutes of Meeti...

متن کامل

Recent developments in configuration design and optimization of mineral separation circuits; A Review

The present research reviews two basic approaches for the separation circuit configuration analysis. The first approach is to optimize the circuit configuration. In this method, after a circuit modeling, a variety of search algorithms and mathematical optimization methods are used. Previous works show that this approach has more application in the flotation process. The second approach called t...

متن کامل

A Two-phase Model for Product Design Development and Evaluation and Supplier Selection in Product Configuration Change Process (Case study: SUPCO)

A supply chain is composed of a complex sequence of processing stages, ranging from raw materials supplies, parts manufacturing, components and end-products assembling, to the delivery of end products. In the context of supply chain management, supplier selection decision is considered one of the key issues faced by operations and purchasing managers to remain competitive. Therefore, requiremen...

متن کامل

Mathematical Method and Thermodynamic Approaches to Design Multi-Component Refrigeration Used in Cryogenic Process Part I: Optimal Operating Conditions

Abstract: Minimizing the work consumed in refrigeration system is the most effective measure to reduce the cost of products in sub-ambient chemical processes. The introduction of mixed working fluids into refrigeration system in place of pure working fluids is a recent advancement applied in the field. Due to the lack of systematic design method for Mixed Refrigerant Cycle (MRC), conventional a...

متن کامل

A Two-phase Model for Product Design Development and Evaluation and Supplier Selection in Product Configuration Change Process (Case study: SUPCO)

A supply chain is composed of a complex sequence of processing stages, ranging from raw materials supplies, parts manufacturing, components and end-products assembling, to the delivery of end products. In the context of supply chain management, supplier selection decision is considered one of the key issues faced by operations and purchasing managers to remain competitive. Therefore, requiremen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004