Rolling-Horizon Algorithm for Scheduling under Time-Dependent Utility Pricing and Availability

نویسندگان

  • Pedro M. Castro
  • Iiro Harjunkoski
  • Ignacio E. Grossmann
چکیده

Abstract This work addresses the scheduling of continuous single-stage multiproduct plants with energy intensive processing tasks and time-dependent electricity cost and power supply. A new rolling horizon algorithm is proposed that consists of a planning model to predict the production levels and a continuous-time model for detailed scheduling. The results from a set of test problems from the literature show that the algorithm can generate global optimal solutions much more rapidly than standalone discrete or continuous-time formulations in problems involving unlimited power availability.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

Multi-period and multi-resource operating room scheduling and rescheduling using a rolling horizon approach: a case study

In this paper, a multi-period and multi-resource operating room (OR) scheduling and rescheduling problem with elective and semi-elective (semi-urgent) patients is addressed. A scheduling-rescheduling framework based on the so-called rolling horizon approach is proposed to solve the problem. The core of the proposed framework is a novel proposed mixed-integer linear programming (MILP) model with...

متن کامل

Optimal scheduling of continuous plants with energy constraints

Abstract This work addresses the scheduling of continuous single stage multiproduct plants with parallel units and shared storage tanks. Processing tasks are energy intensive and we consider timedependent electricity pricing and availability together with multiple intermediate due dates, handled as hard constraints. A new discrete-time aggregate formulation is proposed to rapidly plan the produ...

متن کامل

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

Flexible job shop scheduling under availability constraints

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010