On path correlation and PERT bias
نویسندگان
چکیده
Most studies of project time estimation assume that (a) activity times are mutually independent random variables; many also assume that (b) path completion times are mutually independent. In this paper, we subject the impact of both these assumptions to close scrutiny. Using tools from multivariate analysis, we make a theoretical study of the direction of the error in the classical PERT method of estimating mean project completion time when correlation is ignored. We also investigate the effect of activity dependence on the normality of path length via simulation.
منابع مشابه
A New Approach to Approximate Completion Time Distribution Function of Stochastic Pert Networks
The classical PERT approach uses the path with the largest expected duration as the critical path to estimate the probability of completing a network by a given deadline. However, in general, such a path is not the most critical path (MCP) and does not have the smallest estimate for the probability of completion time. The main idea of this paper is derived from the domination structure between ...
متن کاملExpected Duration of Dynamic Markov PERT Networks
Abstract : In this paper , we apply the stochastic dynamic programming to approximate the mean project completion time in dynamic Markov PERT networks. It is assumed that the activity durations are independent random variables with exponential distributions, but some social and economical problems influence the mean of activity durations. It is also assumed that the social problems evolve in ac...
متن کاملFinding multiple possible critical paths using fuzzy PERT
Program evaluation and review techniques (PERT) is an efficient tool for large project management. In actual project control decisions, PERT has successfully been applied to business management, industry production, project scheduling control, logistics support, etc. However, classical PERT requires a crisp duration time representation for each activity. This requirement is often difficult for ...
متن کاملAn Approximation for the Activity Duration Distribution, Supporting Original PERT
The Program Evaluation and Review Technique (PERT) has been widely used as a tool for project management. In PERT analysis the activity time distribution is assumed to be a beta distribution, and the mean and variance of the activity time are estimated. The activity mean and variance are very useful to find the expected project duration and variance of the critical path. By generalizing the ass...
متن کاملProbit-Based Traffic Assignment: A Comparative Study between Link-Based Simulation Algorithm and Path-Based Assignment and Generalization to Random-Coefficient Approach
Probabilistic approach of traffic assignment has been primarily developed to provide a more realistic and flexible theoretical framework to represent traveler’s route choice behavior in a transportation network. The problem of path overlapping in network modelling has been one of the main issues to be tackled. Due to its flexible covariance structure, probit model can adequately address the pro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- European Journal of Operational Research
دوره 189 شماره
صفحات -
تاریخ انتشار 2008