Team Formation in Concurrent Engineering Using Group Technology (GT) Concepts

نویسندگان

  • Esra E. Aleisa
  • Nallan C. Suresh
  • Li Lin
چکیده

Concurrent engineering (CE) has emerged as an essential design principle that facilitates rapid and efficient product development that is necessary to survive in today’s fiercely competitive environment. However, the lack of tools that address design team formulation and proper design task assignment in CE has made its application an immense challenge. In this article we explicitly address this issue by pointing out the relevance of its structure to cell-formation problem in cellular manufacturing (CM) and group technology. Particularly, interdisciplinary CE teams will be formulated as multifunctional machine-cells that process similar parts, in our case, design tasks requiring involvement of similar individuals. The fruitful marriage of the two disciplines, concurrent engineering and cellular manufacturing, opens the path towards utilizing the ample existing efficient algorithms of cellular manufacturing to concurrent engineering rather than re-inventing the wheel in developing methods in this respect. The paper in-hand also incorporate sequences (or routing in cellular manufacturing) to create work teams that can conduct similar tasks commonly known as work packages in a smoother manner that avoids unnecessary back and forth alterations and overlapping. In addition, to enable solving the task assignment problem in reasonable time for relatively larger problems, the developed framework integrates a fuzzy ART algorithm proven efficient in cellular manufacturing literature. The article also provides an illustrative example on executing the methodology on a design example and highlights its implications on task team assignments.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Cellular Production Systems: a Concurrent Cluster Analytic Framework1

In this paper an agglomerative heuristic cluster analysis framework is proposed for application to the part family and machine cell formation problems associated with Group Technology (GT). This framework addresses the notion of concurrently forming clusters of parts (families) and machines (cells) based upon natural between-part and between-machine relationships and the strength of association...

متن کامل

System - Aware Cyber Security : A Systems Engineering Approach for Enhancing Cyber Security

 ABSTRACT This article highlights the importance of concurrently addressing process, people, and technology factors when conducting research related to new systems engineering concepts. In particular, an ongoing US Department of Defense-sponsored, University of Virginia-led cyber security research project is used as an example of how concurrent research activities provide value earlier in the ...

متن کامل

Preparation of Nc Programs by Group Technology Theory Application

Group technology (GT) has a great significance in the engineering industry. There is the greatest utilisation of GT in planning activities, especially in process planning and in layout machine design. GT is a manufacturing philosophy that has proved successful by grouping parts into families to speed production and reduce costs. In addition, the application of GT can lead to reductions of in-pr...

متن کامل

BM_VE Architecture Reference Model for Concurrent Engineering

(geographic) location and, consequently, contribute to the product and process quality. In that sense, it is supposed that application of virtual enterprise (VE) organizational principles contributes to the agility of the work teams, that is, to the concurrent engineering (CE) work teams, or team work, organization. With the objective to test the potential of virtual enterprise (VE) organizatio...

متن کامل

An Automated Workforce Clustering Method for Business Process Reengineering in Research and Development Organizations

Business process reengineering (BPR) involves the radical redesign of functional organizations into crossfunctional teams to achieve dramatic improvements in productivity. Redesigning complex and dynamic processes in research and development (R&D) organizations with multi-layer projects is a difficult task. Previous researchers have proposed many intuitive approaches for BPR utilizing intuition...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Concurrent Engineering: R&A

دوره 19  شماره 

صفحات  -

تاریخ انتشار 2011