Establishing musculoskeletal oncology service in resource constrained country: challenges and solutions

نویسندگان

  • Obada Hasan
  • Akbar Zubairi
  • Zohaib Nawaz
  • Masood Umer
چکیده

The burden of orthopedic tumor surgery in Pakistan is not known. Similarly the number of procedures being performed for bone and soft tissue surgery are not known. This is even becoming more challenging where the existence of rules and regulations in health care are next to minimal. Furthermore data recording in our country and case registries hardly exist. Despite the lack of information and resources, with high disease burden on community, various providers provide surgical interventions every day in our settings. A lot of tumor surgery is still being done by general surgeons and general orthopedic surgeons who have little knowledge and update about musculoskeletal oncology principles. Lack of subspecialized centers and the high cost of such centers force the patients to visit these surgeons for a highly sophisticated problem like a bone tumor which is the disease of young bones. In this article we will emphasize on the difficulty in establishing an orthopedic tumor service in our part of the world and the consequences including delay in diagnosis, faulty course of management and later decline in functionality, disease progression and increased mortality. We will highlight the principles and stepwise approach of orthopedic tumor surgery and explain the difficulty encountered if these principles are not followed.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

A survey on impact of cloud computing security challenges on NFV infrastructure and risks mitigation solutions

Increased broadband data rate for end users and the cost of resource provisioning to an agreed SLA in telecom service providers, are forcing operators in order to adhere to employment Virtual Network Functions (VNF) in an NFV solution. The newly 5G mobile telecom technology is also based on NFV and Software Define Network (SDN) which inherit opportunities and threats of such constructs. Thus a ...

متن کامل

An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems

In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 2  شماره 

صفحات  -

تاریخ انتشار 2017