Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process

نویسندگان

  • Biswajit Sarkar
  • Ilkyeong Moon
چکیده

This paper illustrates the relationship between quality improvement, reorder point, and lead time, as affected by backorder rate, in an imperfect production process. To reduce the total system cost by optimizing the setup cost, lot size, lead time, reorder point, and process quality parameter simultaneously, we first consider that the lead time demand follows a normal distribution, then we apply the distribution free approach for the lead time demand. We prove two lemmas which are used to find optimal solutions for the basic and distribution free models. We compare our models with the existing models using numerical examples and show that significant savings over the existing models can be achieved. & 2013 Elsevier B.V. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Producer′s Replenishment Policy for an EPQ Model with Rework and Machine Failure Taking Place in Backorder Reloading Time

This paper studies the optimal producer′s replenishment policy for an economic production quantity (EPQ) model with rework and breakdown taking place in backorder replenishing time. A recent published article has studied the lot-sizing problem on an imperfect quality EPQ model. However, another reliability factor random machine breakdown is inevitable in most real-life production systems. To de...

متن کامل

Production Systems with Rework and Machine Failure Taking Place in Backorder Filling Time

This paper investigates the optimal refilling policy for an economic production quantity (EPQ) model with rework and breakdown taking place in backorder replenishing time. A recent published article [Chiu, Y.P., 2003. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization 35, 427-437] has studied...

متن کامل

Optimal Batch Production for a Single Machine System with Accumulated Defectives and Random Rate of Rework

In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world s...

متن کامل

An Integrated Inventory Model with Controllable Lead time and Setup Cost Reduction for Defective and Non-Defective Items

In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...

متن کامل

An EPQ model with setup cost and process quality as functions of capital expenditure

This paper considers an economic production quantity (EPQ) model with imperfect production processes, in which the setup cost and process quality are functions of capital expenditure. The mathematical model is derived to investigate the effects of an imperfect production process on the optimal production cycle time when capital investment strategies in setup reduction and process quality improv...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014