Problem Set 1 Solutions Problem Set Grading

نویسنده

  • Alan Guth
چکیده

The relay station simply rebroadcasts the signal it receives from the source, at exactly the instant that it receives it. The relay station therefore has no effect on the signal received by the observer, but it serves as a crutch for our thinking— it allows us to divide the problem into two parts, each already solved. Let ∆t denote the time interval between wave crests, with subscripts to indicate which clock is making the measurement. Then, from Eqs. (1.3) and (1.7) of Lecture Notes 1,

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An employee transporting problem

An employee transporting problem is described and a set partitioning model is developed. An investigation of the model leads to a knapsack problem as a surrogate problem. Finding a partition corresponding to the knapsack problem provides a solution to the problem. An exact algorithm is proposed to obtain a partition (subset-vehicle combination) corresponding to the knapsack solution. It require...

متن کامل

Characterization of efficient points of the production possibility set under variable returns to scale in DEA

  We suggest a method for finding the non-dominated points of the production possibility set (PPS) with variable returns to scale (VRS) technology in data envelopment analysis (DEA). We present a multiobjective linear programming (MOLP) problem whose feasible region is the same as the PPS under variable returns to scale for generating non-dominated points. We demonstrate that Pareto solutions o...

متن کامل

A genetic algorithm approach for problem

In this paper, a genetic algorithm is presented for an identical parallel-machine scheduling problem with family setup time that minimizes the total weighted flow time ( ). No set-up is necessary between jobs belonging to the same family. A set-up must be scheduled when switching from the processing of family i jobs to those of another family j, i  j, the duration of this set-up being the sequ...

متن کامل

Solving Environmental/Economic Power Dispatch Problem by a Trust Region Based Augmented Lagrangian Method

This paper proposes a Trust-Region Based Augmented Method (TRALM) to solve a combined Environmental and Economic Power Dispatch (EEPD) problem. The EEPD problem is a multi-objective problem with competing and non-commensurable objectives. The TRALM produces a set of non-dominated Pareto optimal solutions for the problem. Fuzzy set theory is employed to extract a compromise non-dominated sol...

متن کامل

Some Results about Set-Valued Complementarity Problem

This paper is devoted to consider the notions of complementary problem (CP) and set-valued complementary problem (SVCP). The set-valued complementary problem is compared with the classical single-valued complementary problem. Also, the solution set of the set-valued complementary problem is characterized. Our results illustrated by some examples. This paper is devoted to co...

متن کامل

An Optimum Algorithm for Single Machine with Early/Tardy Cost

The problem of determining the sequence of a set of jobs with the objective function of minimizing the maximum earliness and tardiness in one machine is studied. &#10 Production systems like JIT are one of the many applications of the problem. This problem is studied in special cases and their optimal solutions are introduced with simple orders. In general, some effective conditions for ne...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016