High Intensity Commissioning of the Sps Lss4 Extraction for Cngs
نویسندگان
چکیده
The SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the CERN Gran Sasso Neutrino project (CNGS). CNGS requires 2 fast extractions of 10.5 microsecond long batches, 50 milliseconds apart. Each batch will consist of 2.4 × 10 protons at 400 GeV. These intensities are factor of 10 above the equipment damage limit in case of beam loss. Active (interlock system) and passive protection systems have to be in place to guarantee safe operation and to respect the radiation limits in zones close to the extraction region. In summer 2006 CNGS was commissioned including extraction with high intensity. A thorough setting-up of the CNGS extraction was carried out as part of the CNGS commissioning, including aperture and beam loss measurements, and defining and checking of interlock thresholds for extraction trajectory, beam loss monitors and radiation monitors. The relevant systems and risks are introduced in this paper, the commissioning results are summarised and comparisons with simulation predictions are presented.
منابع مشابه
European Organization for Nuclear Research Cern – Sl Division Cern-sl-2000-036 Bt the New Sps Extraction Channel for Lhc and Cngs
The Large Hadron Collider (LHC) and CERN Neutrino to Gran Sasso (CNGS) projects require the construction of a new fast-extraction system in the long straight section LSS4 of the Super Proton Synchrotron (SPS) at CERN. A conventional DC septum magnet will be used, in conjunction with the installation of horizontal and vertical extraction bumpers, main quadrupoles with enlarged apertures, extract...
متن کاملM ar 2 00 7 The CNGS Neutrino Beam
The CERN to Gran Sasso Neutrino beam (CNGS) was commissioned at CERN in early August 2006 and was first sent at low intensity to Gran Sasso on August 17, 2006. The Borexino, LVD and OPERA detectors continued the commissioning of their detectors and started taking data with practically no dead time. The CNGS operated smoothly with good quality. In a short time the 3 detectors collected several h...
متن کاملEuropean Organization for Nuclear Research Cern - Sl Division Cern-sl-2000-033 Bt a Novel Eddy Current Septum Magnet for Sps Extraction towards Lhc and Cngs
A new East Fast-Extraction System is under construction in the SPS, to supply particles with a maximum batch length of 7.8 μs and 10.5 μs to the LHC and to CNGS (CERN Neutrino to Gran Sasso), respectively. The extraction septum magnets actually used at the SPS have been designed for slow extraction over several seconds and have large cooling and electrical power demands. A fast system of only 2...
متن کاملNeutrino oscillation physics at an upgraded CNGS with large next generation liquid Argon TPC detectors
The determination of the missing Ue3 element (magnitude and phase) of the PMNS neutrino mixing matrix is possible via the detection of νμ → νe oscillations at a baseline L and energy E given by the atmospheric observations, corresponding to a mass squared difference E/L ∼ ∆m ≃ 2.5× 10 eV . While the current optimization of the CNGS beam provides limited sensitivity to this reaction, we discuss ...
متن کاملEuropean Organization for Nuclear Research Cern – Accelerators and Technology Sector
For several years, a large variety of beams have been prepared in the LHC injectors, such as single-bunch and multi-bunch beams, with 25 ns, 50 ns and 75 ns bunch spacings, nominal and intermediate intensities per bunch. As compared to the nominal LHC beam (i.e. with nominal bunch intensity and 25 ns spacing) the other beams can be produced with lower transverse emittances. Beams of low transve...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2007