Robust Scheduling at a Large IT Services Delivery Center

نویسندگان

  • Elvin Çoban
  • Aliza Heching
  • Alan Scheller-Wolf
چکیده

We study a project scheduling problem at a large IT services delivery center in which there are unpredictable delays. We apply robust optimization to minimize tardiness while informing the customer of a reasonable worst-case completion time. Due to the impracticality of quantifying joint probability distributions for delay times, we follow the recent practice of using empirically determined uncertainty sets, which to our knowledge have not been applied to service scheduling. To solve instances of a realistic size, we introduce a new solution method based on logic-based Benders decomposition. We show that when the uncertainty set is polyhedral, convexity properties of the problem allow us to simplify the decomposition substantially, leading to a model of tractable size.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust Scheduling with Logic-Based Benders Decomposition

We study project scheduling at a large IT services delivery center in which there are unpredictable delays. We apply robust optimization to minimize tardiness while informing the customer of a reasonable worst-case completion time, based on empirically determined uncertainty sets. We introduce a new solution method based on logic-based Benders decomposition. We show that when the uncertainty se...

متن کامل

Integrated Procurement, Production and Delivery Scheduling in a Generalized three Stage Supply Chain

In this research, we investigate a three-stage supply chain with one supplier, several manufacturers and multiple retailers where the supplier provides a common raw material to each manufacturer, who in turn uses a single stage production facility to convert it into final products that are delivered at fixed lot sizes to retailers. An integrated economic procurement, production, and delivery mo...

متن کامل

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

A New Approach Generating Robust and Stable Schedules in m-Machine Flow Shop Scheduling Problems: A Case Study

This paper considers a scheduling problem with uncertain processing times and machine breakdowns in industriall/office workplaces and solves it via a novel robust optimization method. In the traditional robust optimization, the solution robustness is maintained only for a specific set of scenarios, which may worsen the situation  for new scenarios. Thus, a two-stage predictive algorithm is prop...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014