Non-permutation flowshop scheduling in a supply chain with sequence-dependent setup times

نویسندگان

  • Yasaman Mehravaran
  • Rasaratnam Logendran
چکیده

In this paper, we consider a flowshop scheduling problem with sequence-dependent setup times and a bicriteria objective to minimize the work-in-process inventory for the producer and to maximize the customers’ service level. The use of a bicriteria objective is motivated by the fact that successful companies in today’s environment not only try to minimize their own cost but also try to fulfill their customers’ need. Two main approaches, permutation and non-permutation schedules are considered in finding the optimal schedule for a flowshop. In permutation schedules the sequence of jobs remains the same on all machines whereas in non-permutation schedule, jobs can have different sequence on different machines. A linear mathematical model for solving the non-permutation flowshop is developed to comply with all of the operational constraints commonly encountered in the industry, including dynamic machine availabilities, dynamic job releases, and the possibility of jobs skipping one or more machines should their operational requirements deem that it was necessary. As the model is shown to be NP-hard, a metasearch heuristic, employing a newly developed concept known as Tabu search with embedded progressive perturbation (TSEPP) is developed to solve, in particular, industry-size Yasaman Mehravaran, Email: [email protected] Corresponding Author: Rasaratnam Logendran, Tel: 1-541-737-5239, Fax: 1-541-737-2600, E-mail: [email protected] 2 problems efficiently. The effectiveness and efficiency of the search algorithm is assessed by comparing the search algorithmic solutions with that of the optimal solutions obtained from CPLEX in solvable small problem instances.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-objective Immune System for a New Bi-objective Permutation Flowshop Problem with Sequence-dependent Setup Times

 We present a new mathematical model for a permutation flowshop scheduling problem with sequence-dependent setup times considering minimization of two objectives, namely makespan and weighted mean total earliness/tardiness. Only small-sized problems with up to 20 jobs can be solved by the proposed integer programming approach. Thus, an effective multi-objective immune system (MOIS) is ...

متن کامل

Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors

This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...

متن کامل

A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times

This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...

متن کامل

Diversified Particle Swarm Optimization for Hybrid Flowshop Scheduling

The aim of this paper is to propose a new particle swarm optimization algorithm to solve a hybrid flowshop scheduling with sequence-dependent setup times problem, which is of great importance in the industrial context. This algorithm is called diversified particle swarm optimization algorithm which is a generalization of particle swarm optimization algorithm and inspired by an anarchic society ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011