Real Options for Project Schedules (ROPS)

نویسنده

  • Lester Ingber
چکیده

Real Options for Project Schedules (ROPS) has three recursive sampling/optimization shells. An outer Adaptive Simulated Annealing (ASA) optimization shell optimizes parameters of strategic Plans containing multiple Projects containing ordered Tasks. A middle shell samples probability distributions of durations of Tasks. An inner shell samples probability distributions of costs of Tasks. PATHTREE is used to develop options on schedules. Algorithms used for Trading in Risk Dimensions (TRD) are applied to develop a relative risk analysis among projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

Computing optimal subsidies for Iranian renewable energy investments using real options

For the valuation of the renewable energy investments, providing private investors with a financial incentive to accelerate their investment is a very significant issue. Financial subsidies are known by the majority of the people to be one of the most important drivers in renewable energy expansion and one of the main reasons which result in the development of any industry. In this paper, we pr...

متن کامل

Development and validation of a computer program to design and calculate ROPS.

In Spain, there are more than 250,000 tractors built before 1980, when it became mandatory for all new tractors to be equipped with a rollover protective structure (ROPS). A similar situation is found in the European Union, but the situation is worse in the U.S. and in developing countries. Directive 2003/37/EEC establishes that tractors over 800 kg weight can be homologated by using the OECD s...

متن کامل

Evaluating Incremental/Iterative Software Projects by Valuing Investment/Implementation Risks

The optimisation process of scheduling an incremental/iterative software project can be approached as a multi criteria decision problem, formulated by a linear programming model, aimed to propose alternative project schedules and examine cost trade-offs. In this paper, we apply the prominent economic theory of Real Options to analyse project investment risks and discover the economic value asso...

متن کامل

The role of Real option in e-business Risk management: The case of E-treasury project

Implementing information technology projects requires a calculated process to prevent failure. At the same time application of information technology in organizations faces various potential risks. Exploring information technology environment in organizations reveals the potential risks and provides a structure for comprehensive risk management. There are various methods available for risk mana...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • CoRR

دوره abs/0704.0090  شماره 

صفحات  -

تاریخ انتشار 2007