Heuristics for negotiation schedules in multi-plan optimization

نویسندگان

  • Bo An
  • Fred Douglis
  • Fan Ye
چکیده

In cooperating systems such as grids [4] and collaborative streaming analysis [2], autonomous sites can establish “agreements” to arrange access to remote resources for a period of time [1]. The determination of which resources to reserve to accomplish a task need not be known a priori, because there exist multiple plans for accomplishing the same task and they may require access to different resources [3]. While these plans can be functionally equivalent, they may have different performance/cost tradeoffs and may use a variety of resources, both local and belonging to other sites. The negotiation schedule, i.e., the order in which remote resources are negotiated, determines how quickly one plan can be selected and deployed; it also decides the utility for running the plan. This paper studies the problem of optimizing negotiation schedules in cooperative systems with multiple plans. We first provide a votingbased heuristic that reduces the complexityO(n!) of the exhaustive search to O(mnq). We also present a weight-based heuristic that further reduces the complexity to O(mn). Experimental results show that, on average, 1) the voting-based approach achieved 6% higher utility than the weight-based approach but the voting-based approach has a much higher computation cost than the weightbased approach, 2) the two proposed approaches achieved almost 50% higher utility than a randomized approach; and 3) the average utility produced by the two proposed approaches are within almost 90% of that of the optimal results with reasonable plan sizes.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Team-Work based Architecture for Distributed Manufacturing Scheduling

This paper presents a Team-Work based architecture for Distributed Manufacturing Scheduling with Genetic Algorithms and Tabu Search. We consider that a good global solution for a scheduling problem may emerge from a community of machine agents solving locally their schedules and cooperating with other machine agents. Social aspects are considered when a community of autonomous agents cooperate ...

متن کامل

A Multi-agent Negotiation Model Applied in Multi-objective Optimization

Although both multi-objective optimization and agent technology gained a lot of interest during the last decade, many aspects of their functionality still remain open. This paper proposes the multi-agent negotiation model applied in multi-objective optimization. There are three types of agents in the system. The plan agent plans the global best benefit; the action agent plans the best benefit o...

متن کامل

Deterministic and Metaheuristic Solutions for Closed-loop Supply Chains with Continuous Price Decrease

In a global economy, an efficient supply chain as a main core competency empowers enterprises to provide products or services at the right time in the right quantity, at a low cost. This paper is to plan a single product, multi-echelon, multi-period closed loop supply chain for high-tech products (which have continuous price decrease). Ultimately, considering components rated to procurement, pr...

متن کامل

Evaluating alternative MPS development methods using MCDM and numerical simulation

One of the key elements in production planning hierarchy is master production scheduling. The aim of this study is to evaluate and compare thirteen alternative MPS development methods, including multi-objective optimization as well as twelve heuristics, in different operating conditions for multi-product single-level capacity-constrained production systems. We extract six critical criteria from...

متن کامل

Deep Space Network Scheduling Using Multi-Objective Optimization With Uncertainty

We have developed a novel technique to incorporate uncertainty modeling within an evolutionary algorithm approach to multi-objective scheduling, with the goal of identifying a Pareto frontier (tradeoff curve) that recognizes the likelihood of events that can impact the schedule outcome. Our approach is particularly applicable to the generation of multiobjective optimized robust schedules, where...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008