Outage Analysis and Maintenance Strategies in Hydroelectric Production
نویسنده
چکیده
The implementation of major equipment within an existing electrical system necessitates a thorough comprehension of environmental policies, integrated planning, and organizational interaction in the sphere of the endeavor. In a hydroelectric energy system integration methodology, there are various optional processes and detailed analysis encountered throughout the execution. The selection of a turbine generator, for example, requires several layers of evaluation to assess the boundaries of the technology within the existing electrical system. Moreover, the decision-makers must understand the effects of the capital project upgrade as well as maintenance program implementations and utilize system thinking throughout the entire process (LaLiberte, 2013). The principle of the system boundary examines the interaction and issues of importance regardless of the organizational demarcation (Senge, 2006). This boundary principle espouses organizational interaction beyond the limiting constraints and requirements of the venture where one solution creates another problem. In a learning organization where advance technology is proposed, key personnel must comprehend the invisible fabrics of interrelated activities. The renewable energy implementation requires overall system observations – from planning of the technology to the plant-in-service phase and beyond (Martino, 2013). The comprehensive management mechanism is designed specifically for organizational sustainability (Figge, 2002). The tool involves several layers and domains to include performance measurement, cost management, environmental quality, and strategic management, to provide an integrated approach to model and evaluate important areas. The overall objective of the maintenance study examined the financial expenditures associated with generation outages. Specifically, these outages were based on the frequency of maintenance within a five-year period. Forced outages as well as the planned outage data were compiled for the evaluation. Ultimately, the focus of the analysis was based on the fundamental aspects of the intentional outages – planned, maintenance, scheduled, and extensions to sustain the integrity of the system. The hydroelectric generator maintenance program, its related costs, and frequency of the maintenance, was the impetus of the evaluation. The key expenditure of the entire process involved the Lost Opportunity Cost created by the forced and planned outages of generating units. It is a singular value utilized to assess the lost generation as it relates to the energy market prices to replace the diminished megawatt-hours (MWh). Moreover, the approach utilized several utility databases to properly assess the value, time-of-day, and operational condition of the hydroelectric generator before it experiences an outage. The evaluation also included a thirty percent reduction in outages for the Larie, Sembola, and Dosi Power Plants in the Mahalia Facility1 electrical footprint. Consequently, the forecast targets of these decreased outage percentages must equate to lower lost MWhrs and hence reduce maintenance costs. Most organizations are faced with a plethora of information with little or no structures to properly manage its key elements. The components generally reflect patterns of vulnerabilities (too much variability) within certain business units of an organization. The utilization of system mechanisms is designed to assist personnel with the visualization of patterns to frame strategic change options (i.e. reduce variability, re-modification of measures, re-creating interaction patterns) to obtain ideas from intricate theory (Axelrod, 2000). When a new technology is proposed, the alternatives are thoroughly vetted and evaluated within the organizational structure. The innate ability of systems thinking is the drive for humans to learn (Hall, 2007). The model to administer and lead change in an organization is difReginald Wilson Skagit Hydroelectric Project, Seattle City Light, USA
منابع مشابه
Development of system decision support tools for behavioral trends monitoring of machinery maintenance in a competitive environment
The article is centred on software system development for manufacturing company that produces polyethylene bags using mostly conventional machines in a competitive world where each business enterprise desires to stand tall. This is meant to assist in gaining market shares, taking maintenance and production decisions by the dynamism and flexibilities embedded in the package as customers’ demand ...
متن کاملMedium Term Hydroelectric Production Planning - A Multistage Stochastic Optimization Model
Multistage stochastic programming is a key technology for making decisions over time in an uncertain environment. One of the promising areas in which this technology is implementable, is medium term planning of electricity production and trading where decision makers are typically faced with uncertain parameters (such as future demands and market prices) that can be described by stochastic proc...
متن کاملAssociation rule mining application to diagnose smart power distribution system outage root cause
Smart grid has been introduced to address power distribution system challenges. In conventional power distribution systems, when a power outage happens, the maintenance team tries to find the outage cause and mitigate it. After this, some information is documented in a dataset called the outage dataset. If the team can estimate the outage cause before searching for it, the restoration time will...
متن کاملMethodology for the Building of a Fuzzy Expert System for Predictive Maintenance of Hydroelectric Power Plants
The aim of this study is giving continuity to the evolution of the SIMPREBAL methodology and computer system based on the specification OSA-CBM (Open System Architecture for Condition Based Maintenance). The operation of the SIMPREBAL (Predictive Maintenance System of Balbina) system mainly is based on the collection and analysis of the monitored physics variables in hydroelectric power plants,...
متن کاملEstimation of reliability-based maintenance time intervals of Load-Haul-Dumper in an underground coal mine
Reliability estimation plays a significant role in the performance assessment of mining equipment, and aids in designing efficient and effective preventive maintenance strategies. Continuous and random/irregular occurrence of failures in a system could be the main cause for performance drop of machinery. The accomplishment of a projected level of production is possible only by an efficient oper...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -