Integration of Constraint-Based Off-line and On-line Approaches to Project Scheduling

نویسنده

  • Riccardo Rasconi
چکیده

Solving a scheduling problem involves considerations of twofold nature: on one hand, the solution must be searched according to specific optimization needs (off-line requirements), while on the other hand, great effort should be employed into producing solutions which can be safely put into execution in unpredictable environments (on-line requirements). In many cases, these two classes of necessities hide mutually conflicting aspects. Aim of my work is to assess the possible integration of off-line and on-line procedures in project scheduling in order to find the best balance between the two, in view of the inherently dynamical utilization of each produced scheduling solution.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

AN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK

Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...

متن کامل

Multi-objective scheduling and assembly line balancing with resource constraint and cost uncertainty: A “box” set robust optimization

Assembly lines are flow-oriented production systems that are of great importance in the industrial production of standard, high-volume products and even more recently, they have become commonplace in producing low-volume custom products. The main goal of designers of these lines is to increase the efficiency of the system and therefore, the assembly line balancing to achieve an optimal system i...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006