Local search methods for the flowshop scheduling problem with flowtime minimization

نویسندگان

  • Quan-Ke Pan
  • Rubén Ruiz
چکیده

Flowshop scheduling is a very active research area. This problem still attracts a considerable amount of interest despite the sheer amount of available results. Total flowtime minimization of a flowshop has been actively studied and many effective algorithms have been proposed in the last few years. New best solutions have been found for common benchmarks at a rapid pace. However, these improvements many times come at the cost of sophisticated algorithms. Complex methods hinder potential applications and are difficult to extend to small problem variations. Replicability of results is also a challenge. In this paper, we examine simple and easy to implement methods that at the same time result in state-of-the-art performance. The first two proposed methods are based on the well known Iterated Local Search (ILS) and Iterated Greedy (IG) frameworks, which have been applied with great success to other flowshop problems. Additionally, we present extensions of these methods that work over populations, something that we refer to as population-based ILS (pILS) and population-based IG (pIGA), respectively. We calibrate the presented algorithms by means of the Design of Experiments (DOE) approach. Extensive comparative evaluations are carried out against the most recent techniques for the considered problem in the literature. The results of a comprehensive computational and statistical analysis show that the presented algorithms are very effective. Furthermore, we show that, despite their simplicity, the presented methods are able to improve 12 out of 120 best known solutions of Taillard’s flowshop benchmark with total flowtime criterion.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Diversified Particle Swarm Optimization for Hybrid Flowshop Scheduling

The aim of this paper is to propose a new particle swarm optimization algorithm to solve a hybrid flowshop scheduling with sequence-dependent setup times problem, which is of great importance in the industrial context. This algorithm is called diversified particle swarm optimization algorithm which is a generalization of particle swarm optimization algorithm and inspired by an anarchic society ...

متن کامل

An Iterative Random PSO to minimize Total-flow- time in Flowshop Scheduling

Flowshop scheduling is an interdisciplinary challenge of addressing major optimality criteria of minimizing makespan and total-flow-time. The enumerations for finding the probabilities for improving the utilization of resources turn this problem towards NP-Hard. Particle Swam Optimization (PSO) has proven its ability to find of near optimal solution when problem size is large. Local search tech...

متن کامل

An Improved Particle Swarm Optimization for Permutation Flowshop Scheduling Problem with Total Flowtime Criterion

This paper deals with the m-machine permutation flowshop scheduling problem to minimize the total flowtime, an NP-complete problem, and proposes an improved particle swarm optimization (PSO) algorithm. To enhance the exploitation ability of PSO, a stochastic iterated local search is incorporated. To improve the exploration ability of PSO, a population update method is applied to replace non-pro...

متن کامل

Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs

The problem of scheduling in permutation flowshops is considered with the objective of minimizing the makespan, followed by the consideration of minimization of total flowtime of jobs. Two ant-colony optimization algorithms are proposed and analyzed for solving the permutation flowshop scheduling problem. The first algorithm extends the ideas of the ant-colony algorithm by Stuetzle [Proceedings...

متن کامل

A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem

Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 222  شماره 

صفحات  -

تاریخ انتشار 2012