On the Project Management Scheduling based on Agent Technology and Theory of Constraint

نویسنده

  • Chi-Ming Tsou
چکیده

This study proposes a method incorporating agent technique and critical chain technique that based on theory of constraints to solve the project scheduling problem. The approach utilizes thoroughly designed procedure and analytical methods to effectively allocate resources dynamically to achieve the targets of the project. The effectiveness of various scheduling strategies proposed based on the method can be evaluated by parameter simulation techniques. The evaluation results can be used to modify the scheduling for performance improvement. Through case studies it has been demonstrated that the proposed methods can not only shorten the project duration but also improve the project performance in terms of total throughput and less project schedule days. Keyword: Project Management, Agent Technique, Critical Chain

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...

متن کامل

A Project Scheduling Method Based on Fuzzy Theory

In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modif...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Optimization of an energy based bi-objective multi skilled resource investment project scheduling problem

Growing concern in the management of energy due to the increasing energy costs, has forced managers to optimize the amount of energy required to provide products and services. This research integrates an energy-based resource investment project-scheduling problem (RIP) under a multi-skilled structure of the resources. The proposed energy based multi skilled resource investment problem (EB-MSRIP...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • IJEBM

دوره 10  شماره 

صفحات  -

تاریخ انتشار 2012