An object-oriented approach for multi-objective flexible job-shop scheduling problem

نویسنده

  • Vahit Kaplanoglu
چکیده

Flexible manufacturing systems are very complex to control and it is difficult to generate controlling systems for this problem domain. Flexible job-shop scheduling problem (FJSP) is one of the instances in this domain. It is a problemwhich inherits the job-shop scheduling problem (JSP) characteristics. FJSP has additional routing sub-problem in addition to JSP. In routing sub-problem each operation is assigned to a machine out of a set of capablemachines. In scheduling sub-problem the sequence of assigned operations is obtainedwhile optimizing the objective function(s). In this paper an object-oriented (OO) approach is presented for multi-objective FJSP along with simulated annealing optimization algorithm. Solution approaches in the literature generally use two-string encoding scheme to represent this problem. However, OO analysis, design and programming methodology help to present this problem on a single encoding scheme effectively which result in a practical integration of the problem solution to manufacturing control systems where OO paradigm is frequently used. OO design of FJSP is achieved by using UML class diagram and this design reduces the problem encoding to a single data structure where operation object of FJSP could hold its data about alternative machines in its own data structure hierarchically. Many-to-many associations between operations and machines are transformed into two one-to-many associations by inserting a new class between them. Minimization of the following three objective functions are considered in this paper: maximum completion time, workload of the most loaded machine and total workload of all machines. Some benchmark sets are run in order to show the effectiveness of the proposed approach. It is proved that using OO approach for multi-objective FJSP contributes to not only building effective manufacturing control systems but also achieving effective solutions. © 2015 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An algorithm for multi-objective job shop scheduling problem

Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...

متن کامل

A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations

In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

متن کامل

Solving Flexible Job Shop Scheduling with Multi Objective Approach

  In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...

متن کامل

An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method

In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...

متن کامل

A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times

This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Expert Syst. Appl.

دوره 45  شماره 

صفحات  -

تاریخ انتشار 2016