The Signaller's Dilemma: A Cost–Benefit Analysis of Public and Private Communication

نویسندگان

  • Heiner Römer
  • Alexander Lang
  • Manfred Hartbauer
چکیده

BACKGROUND Understanding the diversity of animal signals requires knowledge of factors which may influence the different stages of communication, from the production of a signal by the sender up to the detection, identification and final decision-making in the receiver. Yet, many studies on signalling systems focus exclusively on the sender, and often ignore the receiver side and the ecological conditions under which signals evolve. METHODOLOGY/PRINCIPAL FINDINGS We study a neotropical katydid which uses airborne sound for long distance communication, but also an alternative form of private signalling through substrate vibration. We quantified the strength of predation by bats which eavesdrop on the airborne sound signal, by analysing insect remains at roosts of a bat family. Males do not arbitrarily use one or the other channel for communication, but spend more time with private signalling under full moon conditions, when the nocturnal rainforest favours predation by visually hunting predators. Measurements of metabolic CO(2)-production rate indicate that the energy necessary for signalling increases 3-fold in full moon nights when private signalling is favoured. The background noise level for the airborne sound channel can amount to 70 dB SPL, whereas it is low in the vibration channel in the low frequency range of the vibration signal. The active space of the airborne sound signal varies between 22 and 35 meters, contrasting with about 4 meters with the vibration signal transmitted on the insect's favourite roost plant. Signal perception was studied using neurophysiological methods under outdoor conditions, which is more reliable for the private mode of communication. CONCLUSIONS/SIGNIFICANCE Our results demonstrate the complex effects of ecological conditions, such as predation, nocturnal ambient light levels, and masking noise levels on the performance of receivers in detecting mating signals, and that the net advantage or disadvantage of a mode of communication strongly depends on these conditions.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Is Provision of Healthcare Sufficient to Ensure Better Access? An Exploration of the Scope for Public-Private Partnership in India

Background India’s economic growth rate in recent years has been fairly impressive. But, it has been consistently failing to make considerable progress in achieving health related Millennium Development Goal (MDG) targets. Lack of coherence between provisions and utilization becomes the face of the problem. Inadequacies in outreach, access and affordability coupled with escalating healthcare co...

متن کامل

Assessment criteria and factors affecting the success of Public-Private Partnership (PPPs) in urban construction projects with an emphasis on Factor analysis and Pareto analysis

In the present study, criteria and factors affecting the success of public-private partnership in urban construction projects was examined relying on the combined method (analytical and correlation). In the method, based on the literature and document review and subsequent utilizes a field study (case study, interviews with experts and distributed questionnaires) was an attempt to explore the r...

متن کامل

Cost-effectiveness of laparoscopic sleeve gastrectomy and laparoscopic Roux-en-Y gastric bypass in two hospitals of Tehran city in 2014

    Background: Bariatric surgery with the improvement of obesity-related diseases, increases longevity and quality of life and is more cost-effective when compared to non-surgical Procedures.   Objective: The aim of this study is to compare the cost-effectiveness of Laparoscopic Sleeve Gastrectomy (LSG) and Laparoscopic Roux-en-Y Gastric Bypass (LRYGB).   Method:...

متن کامل

Total Cost of Pre-Hospital Emergency Missions based on the Activity-based Costing Model and its Comparison with the Cost of Private Emergency Pre-Hospital Emergency Services in Mashhad in 2016

Background: Pre-hospital care plays an important role in managing patients who require emergency services and preserving human life. The aim of this study was to evaluate the cost of completed public pre-hospital emergency missions according to the activity-based costing model and to compare it with the cost of private pre-hospital emergency services in Mashhad in 2016. Methods: In this applie...

متن کامل

Study on the Impact of Implementing Public-Private Partnership (PPP) at Hasheminejad Kidney Center

Background and Objectives: As with most countries, in the developing communities, providing high quality services in the field of health care is affected by limited financial resources. Applying the positive stimuli germane to the private sector to public hospital may be one solution to the public sector's problems, and the health care system, in general, for reducing hospital construction and ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره 5  شماره 

صفحات  -

تاریخ انتشار 2010