The Fallacy of a False Trade-off

نویسندگان

  • OTTMAR EDENHOFER
  • STEFFEN BRUNNER
چکیده

When looking at the current pace and progress of international climate negotiations, option 3 (‘die’) seems humankind’s most likely fate. But hopefully that only is a false perception. False is also the tradeoff implied by the heading above. There is no doubt that we have to invest in both adaptation and mitigation. Nevertheless, the question is legitimate as it deals with the emphasis of our efforts. Ultimately, managing the problem of climate change will require the weighing of different kinds of risks arising from climate change, adaptation and mitigation.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

A Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem

Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each act...

متن کامل

Some Determinants of Corporate Financing Decisions: Evidence from the Listed Companies in Tehran Stock Exchange

The aim of this empirical study is to explore the trade-off model and pecking order model of capital structure. The investigation is performed using panel data procedures for a sample of 76 firms listed in Tehran Stock Exchange during 2007-2010.The study employs OLS regression model in examining the capital structure of firms in Iran. The study employs variables reflecting differing theoretical...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009