The steam boiler controller problem in esterel and its

نویسنده

  • Michel Bourdellès
چکیده

We describe the use of the veriication tools xeve and fc2symbmin on the esterel encoding of a Steam Boiler controller proposed by J.R. Abial. xeve is a veriication tool set dedicated to the analysis of synchronous reactive systems in the form of boolean equations, using the symbolic representation of BDDs for implicit state representation. fc2symbmin is a latter addition to this toolset, and allows veriication after reduction and abstraction with respect to bisimulation of explicit nite state machines with a symbolic treatment (using BDDs again) of input event predicates. This speciic representation triggers new algorithmic issues in the computation of bisimulation classes. We demonstrate the power of fc2symbmin in terms of reduction of states, but also in terms of reduction of transitions for which the gain is often dramatic. Description en esterel du contrrleur d'une turbine vapeur et sa vriication par analyse symbolique RRsumm : Nous ddcrivons l'utilisation des outils xeve et fc2symbmin sur la description en esterel du contrrleur d'une turbine vapeur proposs par J.R. Abrial. xeve est un ensemble d'outils de vriication bass sur l'analyse de systtmes rractifs synchrones partir d''quations boollennes, utilisant une reprrsentation implicite de l'espace d''tats par des BDDs. fc2symbmin s'ajoute cet ensemble d'outils, et permet la vriication aprrs rrduction et abstraction suivant une bisimulation partir de la reprrsentation explicite des machines d''tats nis dans laquelle les prrdicats d''vnements d'entrre sont traitts symboliquement (en utilisant encore des BDDs). Cette reprrsentation ammne modiier l'algorithmique de calcul des classes d''quivalence. Nous ddmontrons la puissance de fc2symbmin en terme de rrduction du nombre des tats mais aussi et surtout de transitions.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Hybrid Fuzzy-PID Application in Boilers to Obtain Optimum Efficiency

Many real time processes have complex, uncertain and nonlinear dynamics. Boilers are nonlinear, time varying, multi-input multi-output (MIMO) systems, whose states generally vary with operating conditions. The major problem in controlling that system is that its drum water pressure and steam flow dynamics include an integrator that results a critically stable behavior. Conventional controller p...

متن کامل

Control Reconfiguration of a Boiler-Turbine Unit After Actuator Faults

Boiler-turbines are one of the most important parts in power generation plants. The safety problem in such systems has always been a special concern. This paper discusses the application of control reconfig uration by fault-hiding approach for a boiler-turbine unit. In Fault-hiding approach, after occurrence of a fault, nominal controller of the system remains unchanged; instead, a reconfigurat...

متن کامل

Steam Boiler Control Specification Problem: A TLA Solution

Our solution to the speciication problem in the speciication language TLA+ is based on a model of operation where several components proceed synchronously. Our rst speciication concerns a simpliied controller and abstracts from many details given in the informal problem description. We successively add modules to build a model of the state of the steam boiler, detect failures, and model message...

متن کامل

Steam boiler control speci � cation problem A TLA solution

Our solution to the speci cation problem in the speci cation language TLA is based on a model of operation where several compo nents proceed synchronously Our rst speci cation concerns a simpli ed controller and abstracts from many details given in the informal problem description We successively add modules to build a model of the state of the steam boiler detect failures and model message tra...

متن کامل

Modeling and Control of Water Level in Boiler Drum for Nassiriyah Thermal Power Plant

The boiler drum process is a nonlinear, complex and multivariable process which includes significant time delay. Therefore, the control on the water level in the drum is not easy and ideal. The first objective of this paper is to model the drum water level referring to 210 MW power unit for Nassiriyah thermal power plant. The second objective is to study the water level controller operation wit...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1997