A Label-correcting Tracing Algorithm for the Approximation of the Probability Distribution Function of the Project Completion Time

نویسندگان

  • Ming-Jong Yao
  • Weng-Ming Chu
  • Tsueng-Yao Tseng
چکیده

When facing projects with uncertain factors, most of the project managers are interested to secure the pdf of the completion time of the project so as to have full insights into its randomness. For large-size SAN with general types of pdf for the duration of activities, the project managers must turn to the techniques of discretization since the other approaches in the literature become too demanding in computational loading. In this study, we find that there are two problems when applying the techniques of discretization to obtain an approximated probability density function (pdf) of the project completion time in stochastic activity networks. Namely, first, there exists neither exact data structure nor systematic scheme for the computer programming when applying the techniques of discretization; and second, error may arise from assuming independency between sub-paths in the activity network. Therefore, we are motivated to propose a Label-Correcting Tracing Algorithm (LCTA) to improve the techniques of discretization. To evaluate the performance of the proposed LCTA, we randomly generate 20 sets of 100-node instances in our numerical experiments. Using the pdf’s resultant from Monte Carlo simulation using 20,000 samples as the benchmark, we compared the pdf’s obtained from the PERT model, Dodin’s [10] algorithm and the proposed LCTA. Based on our experimental results, we conclude that the proposed LCTA significantly outperforms the others in both the run time and the precision aspects.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Approach to Approximate Completion Time Distribution Function of Stochastic Pert Networks

The classical PERT approach uses the path with the largest expected duration as the critical path to estimate the probability of completing a network by a given deadline. However, in general, such a path is not the most critical path (MCP) and does not have the smallest estimate for the probability of completion time. The main idea of this paper is derived from the domination structure between ...

متن کامل

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

Combination of Approximation and Simulation Approaches for Distribution Functions in Stochastic Networks

This paper deals with the fundamental problem of estimating the distribution function (df) of the duration of the longest path in the stochastic activity network such as PERT network. First a technique is introduced to reduce variance in Conditional Monte Carlo Sampling (CMCS). Second, based on this technique a new procedure is developed for CMCS. Third, a combined approach of simulation and ap...

متن کامل

A New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management

In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...

متن کامل

A New Lower Bound for Completion Time Distribution Function of Stochastic PERT Networks

In this paper, a new method for developing a lower bound on exact completion time distribution function of stochastic PERT networks is provided that is based on simplifying the structure of this type of network. The designed mechanism simplifies network structure by arc duplication so that network distribution function can be calculated only with convolution and multiplication. The selection of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007