TIPSTER Text Phase II Configuration Management Plan Version 1.2p 3June 1996
ثبت نشده
چکیده
The CM process will document the conformance of each TIPSTER application to the Architecture Design Document and with any applicable APIs. The most important affect of the CM process will be to promote modular substitution, software re-use, and reduced risk of project planning. This will allow for the orderly upgrading of installed systems as technology improves in the future. It will also facilitate the sharing of developed software between Government agencies and offices.
منابع مشابه
TIPSTER Text Phase II Architecture Design Version 2.1p 19 June 1996
Class ObjectReference Class CollectionReference Type of ObjectReference Properties CollectionNarne: string
متن کاملTIPSTER Text Phase II Architecture Concept Version 1.1.1p 3 June 1996
The TIPSTER Architecture is a software architecture for providing Document Detection (i.e. Information Retrieval and Message Routing) and Information Extraction functions to text handling applications. The high level architecture is described in an Architecture Design Document. In May 1996, when the initial architecture design is complete, an Interface Control Document will be provided specifyi...
متن کاملTIPSTER Phase III Goals
The primary goal of TIPSTER Phase III is to promote advancements in text processing technologies. To accomplish this goal, the TIPSTER Program will continue to encourage the cooperation of researchers and developers in government, industry and academia to achieve a balanced overall program. The Phase III framework is modeled on that of Phase II and will consist of four basic components: (1) Adv...
متن کاملBuilding an Architecture: a CAWG Saga
The Tipster Architecture a standardized interface for providing document management, document retrieval, and information extraction services is one of the major products of Phase II of the Tipster program. The architecture was developed by the Contractors' Architecture Working Group (CAWG) over the past two years. It has been refined through feedback from the demos developed by the CAWG for the...
متن کاملTIPSTER Text Phase II Architecture Requirements Version 2.0p 3 June 1996
Version 2.0p 3 June 1996 Architecture Commitee tipster @ tipster.org 1.0 INTRODUCTION 1.1 Requirements Traceability The requirements herein are derived from several Government agencies. Some requirements may be traced to specific documents given below. Interviews with Government personnel were also a source. When possible, the source documents, shown as (n), indicate the basis for the TIPSTER r...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1996