An alternative to safety stock policies for multi-level rolling schedule MRP problems

نویسندگان

  • Nico P. Dellaert
  • Jully Jeunet
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Re-examining the Performance of Mrp and Kanban Material Control Strategies for Multi-product Flexible Manufacturing Systems

Material control schemes can be classified as push, pull, or hybrid strategies. This paper compares the performance of MRP (push) and kanban (pull) for a multi-stage, multiproduct manufacturing system. Using simulation experiments we analyze system performance under different product mixes and observe that in certain environments with advance demand information kanban-based pull strategies can ...

متن کامل

A Multi-level Capacitated Lot-sizing Problem with Safety Stock Deficit and Production Manners: A Revised Simulated Annealing

[1] Corresponding author e-mail: [email protected]   [1] Corresponding author e-mail: [email protected]   Lot-sizing problems (LSPs) belong to the class of production planning problems in which the availability quantities of the production plan are always considered as a decision variable. This paper aims at developing a new mathematical model for the multi-level ca...

متن کامل

توسعه یک مدل دو هدفه فازی جهت تنظیم ذخیره اطمینان در واحدهای ذخیره موجودی زنجیره تامین

Uncertainty is an inseparable part of supplying chain management, which could be resulted from the customer’s demand fluctuation, change of production capacity or lack of reliability of the raw materials suppliers and the contractors .to act properly in response of the said matters, the safety stock could be used.In the present article, considering the existing problems and conditions of Ghataa...

متن کامل

The Simultaneous Effect of Holding Safety Stock and Purchasing Policies on the Economic Production Quantity Model Subject to Random Machine Breakdown

In this paper, we develop an economic production quantity (EPQ) model under machine breakdown and two types of repair (corrective and preventive). also, study the simultaneous effect of holding safety stock and purchasing policy. In order to avoid shortages occurring as a result of the random repair time, in addition to keep safety stock, we suppose that the manufacturer could purchase some qua...

متن کامل

A Comparison of Two Exact Methods for Passenger Railway Rolling Stock (Re)Scheduling

In passenger railway optimization one of the main goals is to make efficient plans that can accommodate all passengers or, if that is not possible, that minimize the seat shortages. In the planning process, a railway operator tries to match the demand by first selecting an appropriate timetable followed by a matching rolling stock schedule. We focus on the second stage where a rolling stock sch...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 163  شماره 

صفحات  -

تاریخ انتشار 2005