A Yard Crane Scheduling Problem with Practical Constraints
نویسندگان
چکیده
The problem considered in this paper is to locate storage containers while a set of container storage and retrieval requests are sequenced. Two automated cranes stack and retrieve containers in a single block of a yard. The cranes cannot pass each other and must be separated by a safety distance. Storage containers are initially located at the seaside and landside input/output (I/O) points of the block. Each must be stacked in a specific location of the block, selected from a set of open locations suitable for stacking the storage container. Retrieval containers are initially located in the block and must be delivered to the I/O points. Due to the importance and acceptable waiting times of different modes of transport, requests have different priorities. The problem is modeled as a multiple asymmetric generalized traveling salesman problem with precedence constraints. The objective is to minimize the makespan. We have developed an adaptive large neighborhood search heuristic to quickly compute near-optimal solutions. The numerical experiments show that the solution method can obtain near-optimal solutions.
منابع مشابه
Yard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملQuay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملThe simultaneous reshuffle and yard crane scheduling problem in container terminals
This paper studies the simultaneous reshuffle and yard crane scheduling problem in the yard of container terminals, which is one of the key logistics problems affecting the operation efficiency in container terminals. Although the reshuffle scheduling problem has received many research attention due to its importance, the problem without considering yard crane is not very practical, which is be...
متن کاملYard Crane Pools and Optimum Layouts for Storage Yards of Container Terminals
As more and more container terminals open up all over the world, competition for business is becoming very intense for container terminal operators. They are finding out that even to keep their existing Sea Line customers, they have to make them happy by offering higher quality service. The quality of service they can provide depends on their operating policies and the design of the terminal la...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2013