Performance Variability and Project Dynamics

نویسندگان

  • Bernardo A. Huberman
  • Dennis M. Wilkinson
چکیده

We present a dynamical theory of complex cooperative projects such as large engineering design or software development efforts, comprised of concurrent and interrelated tasks. The model accounts for temporal fluctuations both in task performance and in the interactions between related tasks. We show that as the system size increases, so does the average completion time. Also, for fixed system size, the dynamics of individual project realizations can exhibit large deviations from the average when fluctuations increase past a threshold, causing long delays in completion times. This effect is in agreement with empirical observations, and can be mitigated by arranging projects in a hierarchical or modular structure. ∗HP Labs, 1501 Page Mill Rd., Palo Alto, CA, 94304

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Effects of Heart Rate Variability on Reading Performance among Iranian EFL Learners

Psychophysiological studies and MRI neuro-imaging findings provide evidence that heart rate variability (HRV) which is in control of our emotions affects our brain cognitive centers. It has been shown that coherent heart-brain interaction can change the pattern of the afferent cardiac input that is sent to the brain. For this purpose, the Institute of HeartMath (IHM) has proposed a kind of biof...

متن کامل

Cause and Effect Analysis of Risks of Refinery Developmental Turnkey Projects through System Dynamics Approach Case Study: Development Project of Third Distillation Unit and LPG (Liquefied Petroleum Gas) in Isfahan Oil Refinery

Project managers are grappling with a variety of risks today as a result of increasing complexity and dynamics of projects in different stages of project life cycle. Thus, it seems quite necessary to employ an efficient risk management process that can overcome the shortcomings of traditional methods in order to handle such complexities and reach the optimal project management. This matter is e...

متن کامل

Cause and Effect Analysis of Risks of Refinery Developmental Turnkey Projects through System Dynamics Approach Case Study: Development Project of Third Distillation Unit and LPG (Liquefied Petroleum Gas) in Isfahan Oil Refinery

Project managers are grappling with a variety of risks today as a result of increasing complexity and dynamics of projects in different stages of project life cycle. Thus, it seems quite necessary to employ an efficient risk management process that can overcome the shortcomings of traditional methods in order to handle such complexities and reach the optimal project management. This matter is e...

متن کامل

A Systems Dynamics Model for Project Management systems of Project-Based Organization

It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...

متن کامل

System Dynamics Aproach For Quantitative Risk Allocaion

Allocation of construction risks between clients and their contractors has a significant impact on the total construction costs. This paper presents a system dynamics (SD)-based approach for quantitative risk allocation. Using the proposed SD based approach, all the factors affecting the risk allocation process are modeled. The contractor’s defensive strategies against the one-sided risk alloca...

متن کامل

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Computational & Mathematical Organization Theory

دوره 11  شماره 

صفحات  -

تاریخ انتشار 2005