Needs Assessment in Health Research Projects: A New Approach to Project Management in Iran

نویسندگان

  • Niloofar PEYKARI
  • Parviz OWLIA
  • Hossein MALEKAFZALI
  • Mostafa GHANEI
  • Abdolreza BABAMAHMOODI
  • Shirin DJALALINIA
چکیده

BACKGROUND The science and technology health plan has defined the outline of health research to the national vision of Iran by 2025. The aim of this study was to focus on the process of needs assessment of health research projects also health research priority setting in Iran. METHODS THE PROJECT MANAGEMENT LIFE CYCLE HAS FOUR PHASES: Initiation, Planning, Execution and Closure. Based on abovementioned points we conducted the study. RESULTS Focusing on the needs assessment led to systematic implementation of needs assessment of health project in all of the medical sciences universities. Parallel with this achieved strategies health research priority setting was followed through specific process from empowerment to implementation. CONCLUSION We should adopt with more systematic progressive methods of health project managements for both our national convenience as well as our international health research programs.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis

Background Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considere...

متن کامل

Resilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)

Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...

متن کامل

Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method

Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...